Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0961 # 03 Y:2017 | 03 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $1,272 | $4,748 | Not Implemented |
UD0961 # 04 Y:2017 | 04 | 2017 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,969 | $23,750 | Not Implemented |
UD0961 # 05 Y:2017 | 05 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,937 | $1,000 | Not Implemented |
UD0961 # 06 Y:2017 | 06 | 2017 | REDUCE FLUID FLOW RATES | $5,273 | $1,000 | Not Implemented |
UD0961 # 07 Y:2017 | 07 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,802 | $3,700 | Not Implemented |
UD0961 # 08 Y:2017 | 08 | 2017 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $18,094 | $103,500 | Not Implemented |
UD0960 # 01 Y:2017 | 01 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $10,202 | $0 | Implemented |
UD0960 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,385 | $0 | Implemented |
UD0960 # 03 Y:2017 | 03 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $10,808 | $0 | Implemented |
UD0960 # 04 Y:2017 | 04 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,390 | $1,000 | Implemented |
UD0960 # 05 Y:2017 | 05 | 2017 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $17,273 | $0 | Implemented |
UD0960 # 06 Y:2017 | 06 | 2017 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $514 | $1,425 | Implemented |
UD0960 # 07 Y:2017 | 07 | 2017 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $8,266 | $3,000 | Not Implemented |
UD0960 # 08 Y:2017 | 08 | 2017 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $11,351 | $10,000 | Not Implemented |
UD0960 # 09 Y:2017 | 09 | 2017 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,234 | $7,500 | Not Implemented |
UD0960 # 10 Y:2017 | 10 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,121 | $0 | Not Implemented |
UD0960 # 11 Y:2017 | 11 | 2017 | USE MINIMUM STEAM OPERATING PRESSURE | $826 | $0 | Not Implemented |
UD0960 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,179 | $97,386 | Not Implemented |
UD0960 # 13 Y:2017 | 13 | 2017 | INSTALL OCCUPANCY SENSORS | $6,486 | $9,108 | Not Implemented |
UD0960 # 14 Y:2017 | 14 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,599 | $9,362 | Not Implemented |
OR0682 # 01 Y:2017 | 01 | 2017 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $104,297 | $70,000 | Not Implemented |
OR0682 # 02 Y:2017 | 02 | 2017 | REPLACE BOILER | $4,289 | $23,625 | Not Implemented |
OR0682 # 03 Y:2017 | 03 | 2017 | REPLACE BOILER | $1,937 | $9,815 | Not Implemented |
OR0681 # 01 Y:2017 | 01 | 2017 | USE OPTIMUM TEMPERATURE | $7,040 | $0 | Not Implemented |
OR0681 # 02 Y:2017 | 02 | 2017 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $12,375 | $2,995 | Not Implemented |