IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0558 # 04 Y:2024 04 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $2,000 Not Implemented
LE0558 # 05 Y:2024 05 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,840 $18,014 Implemented
LE0558 # 06 Y:2024 06 2024 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $7,995 $37,000 Implemented
LE0558 # 07 Y:2024 07 2024 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $474 $2,500 Implemented
CW0130 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,562 $17,397 n/a
CW0130 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $4,196 $2,050 n/a
CW0130 # 03 Y:2024 03 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $17,298 $8,391 n/a
CW0130 # 04 Y:2024 04 2024 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $202 $424 n/a
CW0130 # 05 Y:2024 05 2024 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $7,210 $13,000 n/a
CW0130 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $1,786 $6,750 n/a
UU0243 # 01 Y:2024 01 2024 AIR CONDITION ONLY SPACE NECESSARY $26,330 $19,500 Implemented
UU0243 # 02 Y:2024 02 2024 USE POWER DURING OFF-PEAK PERIODS $15,800 $13,000 Not Implemented
UU0243 # 03 Y:2024 03 2024 COVER OPEN TANKS $9,190 $7,340 Implemented
UU0243 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,631 $22,338 Not Implemented
UU0243 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,244 $14,145 Not Implemented
UU0243 # 06 Y:2024 06 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,800 $6,300 Implemented
UU0243 # 07 Y:2024 07 2024 OPTIMIZE PLANT POWER FACTOR $1,900 $6,000 Implemented
IC0296 # 01 Y:2024 01 2024 INSULATE BARE EQUIPMENT $5,921 $1,066 Implemented
IC0296 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $15,196 $12,921 Not Implemented
IC0296 # 03 Y:2024 03 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $8,777 $8,406 Implemented
IC0296 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,324 $400 Implemented
IC0296 # 05 Y:2024 05 2024 UPGRADE CONTROLS ON COMPRESSORS $7,015 $9,479 Not Implemented
IC0296 # 06 Y:2024 06 2024 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $10,898 $23,884 Implemented
IC0296 # 07 Y:2024 07 2024 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $465,211 $3,649,800 Not Implemented
IC0296 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $271,456 $1,202,972 Not Implemented