Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0421 # 06 Y:1993 | 06 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $38 | $0 | Not Implemented |
OK0414 # 01 Y:1993 | 01 | 1993 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $17,978 | $19,647 | Not Implemented |
OK0414 # 02 Y:1993 | 02 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,531 | $200 | Implemented |
OK0414 # 03 Y:1993 | 03 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,446 | $0 | Implemented |
OK0414 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,058 | $3,889 | Implemented |
OK0412 # 01 Y:1993 | 01 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,522 | $16,100 | Not Implemented |
OK0412 # 02 Y:1993 | 02 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $74 | $3,053 | Implemented |
OK0412 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $713 | $0 | Not Implemented |
OK0412 # 04 Y:1993 | 04 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,747 | $5,964 | Not Implemented |
OK0412 # 05 Y:1993 | 05 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,145 | $0 | Implemented |
OK0413 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,243 | $39,528 | Implemented |
OK0413 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,746 | $19,728 | Implemented |
OK0413 # 03 Y:1993 | 03 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,510 | $0 | Implemented |
OK0413 # 04 Y:1993 | 04 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $15,458 | $7,400 | Not Implemented |
OK0413 # 05 Y:1993 | 05 | 1993 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,401 | $5,910 | Not Implemented |
OK0408 # 01 Y:1993 | 01 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,446 | $1,961 | Not Implemented |
OK0408 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,314 | $753 | Not Implemented |
OK0408 # 03 Y:1993 | 03 | 1993 | INSULATE BARE EQUIPMENT | $1,668 | $3,528 | Not Implemented |
OK0408 # 04 Y:1993 | 04 | 1993 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $2,789 | $9,000 | Not Implemented |
OK0411 # 01 Y:1993 | 01 | 1993 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,179 | $946 | Implemented |
OK0411 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $211 | $174 | Implemented |
OK0411 # 03 Y:1993 | 03 | 1993 | OPTIMIZE PLANT POWER FACTOR | $2,790 | $3,332 | Not Implemented |
OK0411 # 04 Y:1993 | 04 | 1993 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $76,619 | $177,000 | Not Implemented |
OK0411 # 05 Y:1993 | 05 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $198 | $375 | Not Implemented |
OK0404 # 01 Y:1993 | 01 | 1993 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $53,433 | $110,746 | Implemented |