IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0641 # 15 Y:2002 15 2002 SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED $673 $1,275 Not Implemented
SU0132 # 01 Y:2002 01 2002 USE OPTIMUM THICKNESS INSULATION $1,746 $0 Not Implemented
SU0132 # 02 Y:2002 02 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,727 $8,057 Implemented
SU0132 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $5,704 $472 Implemented
SU0132 # 04 Y:2002 04 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $5,586 $392 Implemented
SU0132 # 05 Y:2002 05 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,123 $0 Implemented
SU0132 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $451 $809 Not Implemented
SU0132 # 07 Y:2002 07 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $357 $40 Not Implemented
SU0132 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $290 $107 Not Implemented
SU0132 # 09 Y:2002 09 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $154 $0 Implemented
SU0132 # 10 Y:2002 10 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $48 $79 Not Implemented
UU0019 # 01 Y:2002 01 2002 INSTALL SKYLIGHTS $12,317 $7,800 Not Implemented
UU0019 # 02 Y:2002 02 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $680 $545 Implemented
UU0019 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,839 $2,400 Not Implemented
UU0019 # 04 Y:2002 04 2002 USE OPTIMUM THICKNESS INSULATION $8,790 $2,670 Implemented
UU0019 # 05 Y:2002 05 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $17,300 $18,000 Not Implemented
UU0019 # 06 Y:2002 06 2002 ISOLATE HOT OR COLD EQUIPMENT $12,399 $22,269 Implemented
UU0019 # 07 Y:2002 07 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $10,878 $6,350 Implemented
WI0416 # 01 Y:2002 01 2002 RECOVER AND REUSE WASTE MATERIAL $2,010 $8,000 Not Implemented
WI0416 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,608 $400 Implemented
WI0416 # 03 Y:2002 03 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,968 $0 Implemented
WI0416 # 04 Y:2002 04 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $2,080 $0 Not Implemented
WI0416 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,925 $90 Implemented
WI0416 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,387 $0 Not Implemented
WI0416 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,411 $6,600 Implemented