IAC Assessment: WI0416
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0416
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Steel
NAICS n/a
SIC 3599 - Industrial Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 70
Plant Area (Sq.Ft.) 60,000
Annual Production 875,000 Pounds
Production Hrs. Annual 2,200
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $27,555 774,900 kWh $0.04
Electricity Demand $21,653 3,686 kW-months/year $5.87
Electricity Fees $4,958 - $ -
Natural Gas $77,290 28,233 MMBtu $2.74
TOTAL ENERGY COSTS $148,499
RECOMMENDED SAVINGS* $16,556 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,389
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$2,010
Cost:
$8,000
- - - - - - $3,885 2,640 - - $(-1,875) - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,885
2,640
gal
-
-
lb
$(-1,875)
-
$
02: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,608
Cost:
$400
- - - - $3,608 1,322 - - - - - - -
-
kWh
-
-
kW-months/year
$3,608
1,322
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,968
Cost:
-
$58 (-1,553) - - $2,910 1,066 - - - - - - $58
(-1,553)
kWh
-
-
kW-months/year
$2,910
1,066
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$2,080
Cost:
-
- - - - - - - - $2,080 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$2,080
-
lb
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,925
Cost:
$90
$1,154 30,687 $771 124 - - - - - - - - $1,154
30,687
kWh
$771
124
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,387
Cost:
-
- - $1,387 131 - - - - - - - - -
-
kWh
$1,387
131
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,411
Cost:
$6,600
$844 22,444 $567 91 - - - - - - - - $844
22,444
kWh
$567
91
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
08: 3.7137 REPLACE CLOTH RAGS WITH PAPER TOWELS Savings:
$690
Cost:
-
- - - - - - - - $690 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$690
-
lb
-
-
$
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$477
Cost:
-
- - - - $477 175 - - - - - - -
-
kWh
-
-
kW-months/year
$477
175
MMBtu
-
-
gal
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$16,556
Cost:
$15,090
$2,056 51,578 $2,725 346 $6,995 2,563 $3,885 2,640 $2,770 - $(-1,875) - $2,056
51,578
kWh
$2,725
346
kW-months/year
$6,995
2,563
MMBtu
$3,885
2,640
gal
$2,770
-
lb
$(-1,875)
-
$
TOTAL IMPLEMENTED Savings:
$10,389
Cost:
$7,090
$2,056 51,578 $1,338 215 $6,995 2,563 - - - - - - $2,056
51,578
kWh
$1,338
215
kW-months/year
$6,995
2,563
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Other Liquid (haz) Solid Waste (non-haz) Personnel Changes