IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UM0296 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,647 $3,688 Not Implemented
UM0296 # 03 Y:2006 03 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,389 $75 Not Implemented
UM0296 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $1,352 $400 Not Implemented
UM0296 # 05 Y:2006 05 2006 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,144 $392 Not Implemented
UM0296 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $646 $200 Not Implemented
UM0296 # 07 Y:2006 07 2006 INSTALL OCCUPANCY SENSORS $255 $92 Not Implemented
BD0302 # 01 Y:2006 01 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,774 $0 Not Implemented
BD0302 # 02 Y:2006 02 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,381 $0 Implemented
BD0302 # 03 Y:2006 03 2006 USE RADIANT HEATER FOR SPOT HEATING $1,699 $5,000 Not Implemented
BD0302 # 04 Y:2006 04 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,130 $0 Implemented
BD0302 # 05 Y:2006 05 2006 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $848 $260 Not Implemented
BD0302 # 06 Y:2006 06 2006 INSTALL OCCUPANCY SENSORS $835 $1,050 Not Implemented
BD0302 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1 $0 Not Implemented
BD0302 # 08 Y:2006 08 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,195 $1,550 Not Implemented
BD0302 # 09 Y:2006 09 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $384 $0 Implemented
BD0302 # 10 Y:2006 10 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $344 $500 Implemented
BD0302 # 11 Y:2006 11 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $304 $2,550 Not Implemented
BD0302 # 12 Y:2006 12 2006 MINIMIZE WATER USAGE $2,375 $1,725 Not Implemented
SD0376 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $46,522 $143,750 Not Implemented
SD0376 # 02 Y:2006 02 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,390 $43,125 Not Implemented
SD0376 # 03 Y:2006 03 2006 AVOID FROST FORMATION ON EVAPORATORS $16,408 $31,225 Implemented
SD0376 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,062 $31,291 Implemented
SD0376 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,642 $0 Implemented
SD0376 # 06 Y:2006 06 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,516 $12,616 Not Implemented
SD0376 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $997 $502 Implemented