IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

12,007

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0435 # 01 Y:2011 01 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $704 $0 Implemented
SD0435 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,875 $700 Implemented
SD0435 # 03 Y:2011 03 2011 USE DIRECT FLAME IMPINGEMENT OR INFRARED PROCESSING FOR CHAMBER TYPE HEATING $14,990 $3,784 Not Implemented
SD0435 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,988 $4,310 Implemented
SD0435 # 05 Y:2011 05 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $2,282 $1,000 Implemented
SD0435 # 06 Y:2011 06 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $866 $840 Implemented
SD0434 # 01 Y:2011 01 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $799 $100 Implemented
SD0434 # 02 Y:2011 02 2011 INSTALL OCCUPANCY SENSORS $7,897 $1,387 Implemented
SD0434 # 03 Y:2011 03 2011 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,711 $500 Not Implemented
SD0434 # 04 Y:2011 04 2011 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $4,279 $4,751 Not Implemented
SD0434 # 05 Y:2011 05 2011 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $1,400 $2,063 Implemented
SD0434 # 06 Y:2011 06 2011 INSTALL SKYLIGHTS $11,302 $26,616 Not Implemented
SF0397 # 01 Y:2011 01 2011 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $12,161 $0 Implemented
SF0397 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,394 $0 Implemented
SF0397 # 03 Y:2011 03 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,482 $1,759 Not Implemented
SF0397 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $12,301 $9,456 Not Implemented
SF0397 # 05 Y:2011 05 2011 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $2,066 $2,420 Implemented
SF0397 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,920 $6,639 Not Implemented
SF0397 # 07 Y:2011 07 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,428 $6,271 Implemented
SF0397 # 08 Y:2011 08 2011 INSTALL OCCUPANCY SENSORS $3,294 $7,163 Implemented
SF0397 # 09 Y:2011 09 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $19,656 $79,881 Implemented
SF0397 # 10 Y:2011 10 2011 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $28,839 $152,713 Not Implemented
SF0396 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,923 $0 Implemented
SF0396 # 02 Y:2011 02 2011 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,498 $1,199 Implemented
SF0396 # 03 Y:2011 03 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,230 $1,731 Not Implemented