IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0256 # 08 Y:2003 08 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $1,260 $28,000 Implemented
NC0256 # 09 Y:2003 09 2003 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $60,400 $20,000 Implemented
NC0256 # 10 Y:2003 10 2003 MODIFY CURRENT INCENTIVE PROGRAM $190,000 $14,000 Not Implemented
OK0658 # 01 Y:2003 01 2003 UPGRADE CONTROLS ON COMPRESSORS $51,704 $45,000 Implemented
OK0658 # 02 Y:2003 02 2003 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $25,266 $0 Not Implemented
OK0658 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $11,031 $0 Implemented
OK0658 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,978 $367 Implemented
OK0658 # 05 Y:2003 05 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,150 $5,273 Implemented
OK0658 # 06 Y:2003 06 2003 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $30,454 $60,000 Not Implemented
OK0658 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,028 $117 Not Implemented
OK0658 # 08 Y:2003 08 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,609 $30,876 Implemented
OK0658 # 09 Y:2003 09 2003 INSTALL OCCUPANCY SENSORS $6,270 $2,004 Implemented
OK0658 # 10 Y:2003 10 2003 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $7,445 $0 Not Implemented
WV0264 # 01 Y:2003 01 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,905 $2,325 Implemented
WV0264 # 02 Y:2003 02 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $5,722 $900 Implemented
WV0264 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,317 $90 Implemented
WV0264 # 04 Y:2003 04 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $260 $0 Implemented
WV0264 # 05 Y:2003 05 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $690 $3,419 Implemented
WV0264 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $527 $250 Implemented
WV0264 # 07 Y:2003 07 2003 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $721 $40 Not Implemented
WI0441 # 01 Y:2003 01 2003 INCREASE USE OF AUTOMATION $66,563 $30,000 Not Implemented
WI0441 # 02 Y:2003 02 2003 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $5,650 $16,800 Implemented
WI0441 # 03 Y:2003 03 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $2,550 $0 Implemented
WI0441 # 04 Y:2003 04 2003 USE POWER DURING OFF-PEAK PERIODS $1,486 $0 Not Implemented
WI0441 # 05 Y:2003 05 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $168 $640 Not Implemented