IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD1075 # 07 Y:2024 07 2024 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $712,662 $195,000 Implemented
WM0210 # 01 Y:2024 01 2024 OPTIMIZE PLANT POWER FACTOR $12,043 $21,250 Not Implemented
WM0210 # 02 Y:2024 02 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $8,116 $0 Not Implemented
WM0210 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,452 $0 Not Implemented
WM0210 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,808 $1,400 Implemented
WM0210 # 05 Y:2024 05 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,410 $7,096 Implemented
WM0210 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $2,041 $278 Not Implemented
WM0210 # 07 Y:2024 07 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $566 $1,050 Not Implemented
WM0210 # 08 Y:2024 08 2024 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $564 $1,417 Not Implemented
WM0210 # 09 Y:2024 09 2024 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $277 $0 Not Implemented
UU0240 # 01 Y:2024 01 2024 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $10,047 $10,320 Not Implemented
UU0240 # 02 Y:2024 02 2024 INCREASE AMOUNT OF CONDENSATE RETURNED $1,601 $7,755 Implemented
UU0240 # 03 Y:2024 03 2024 TURN OFF EQUIPMENT WHEN NOT IN USE $1,286 $1,500 Implemented
UU0240 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $977 $113 Implemented
UU0240 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $544 $1,387 Implemented
LE0557 # 01 Y:2024 01 2024 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $279,544 $0 n/a
LE0557 # 02 Y:2024 02 2024 INSTALL TIMERS AND/OR THERMOSTATS $87,150 $3,000 n/a
LE0557 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,494 $100 n/a
LE0557 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,783 $9,500 n/a
LE0557 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $197,906 $323,780 n/a
LE0557 # 06 Y:2024 06 2024 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $291,977 $600,000 n/a
LE0557 # 07 Y:2024 07 2024 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,463 $29,000 n/a
LE0557 # 08 Y:2024 08 2024 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $9,250 $37,000 n/a
SF0613 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,003 $100 n/a
SF0613 # 02 Y:2024 02 2024 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,636 $2,272 n/a