IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,314

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0078 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $54,544 $70,044 Implemented
AS0078 # 03 Y:1993 03 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $403 $1,200 Implemented
AS0078 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,100 Not Implemented
AS0078 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $0 Implemented
AS0078 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $364 $0 Implemented
AS0078 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $219 $450 Not Implemented
AS0077 # 01 Y:1993 01 1993 REDESIGN PROCESS $15,475 $11,000 Not Implemented
AS0077 # 02 Y:1993 02 1993 INSULATE BARE EQUIPMENT $10,939 $9,136 Implemented
AS0077 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,200 $15,080 Not Implemented
AS0077 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $251 $1,440 Not Implemented
AS0077 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,014 $135,000 Not Implemented
AS0077 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,281 $500 Implemented
AS0077 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $18,482 $81,500 Not Implemented
AS0077 # 08 Y:1993 08 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $473 $2,507 Implemented
AS0077 # 09 Y:1993 09 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,136 $0 Implemented
AS0076 # 01 Y:1993 01 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $27,862 $65,800 Not Implemented
AS0076 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $606 $0 Implemented
AS0076 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,612 $12,391 Not Implemented
AS0076 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $557 $2,128 Not Implemented
AS0076 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $137 $250 Not Implemented
AS0076 # 06 Y:1993 06 1993 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $1,339 $2,035 Not Implemented
AS0076 # 07 Y:1993 07 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,191 $4,400 Not Implemented
AS0076 # 08 Y:1993 08 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $15,260 $18,920 Not Implemented
AS0076 # 09 Y:1993 09 1993 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,126 $0 Implemented
AS0076 # 10 Y:1993 10 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $219 $329 Implemented