Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0341 # 04 Y:1988 | 04 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,195 | $1,650 | Not Implemented |
TN0341 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $2,054 | $0 | Implemented |
TN0341 # 06 Y:1988 | 06 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,646 | $765 | Not Implemented |
TN0341 # 07 Y:1988 | 07 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $429 | $1,600 | Implemented |
TN0338 # 01 Y:1988 | 01 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,835 | $42,500 | Not Implemented |
TN0338 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $5,878 | $2,140 | Not Implemented |
TN0338 # 03 Y:1988 | 03 | 1988 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,173 | $375 | Not Implemented |
TN0338 # 04 Y:1988 | 04 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,373 | $4,250 | Not Implemented |
TN0338 # 05 Y:1988 | 05 | 1988 | IMPROVE LUBRICATION PRACTICES | $2,472 | $3,600 | Not Implemented |
TN0338 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,523 | $0 | Not Implemented |
TN0338 # 07 Y:1988 | 07 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $518 | $710 | Not Implemented |
TN0339 # 01 Y:1988 | 01 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $33,546 | $10,370 | Implemented |
TN0339 # 02 Y:1988 | 02 | 1988 | USE MINIMUM STEAM OPERATING PRESSURE | $29,352 | $31,700 | Not Implemented |
TN0339 # 03 Y:1988 | 03 | 1988 | INSULATE BARE EQUIPMENT | $14,539 | $3,576 | Not Implemented |
TN0339 # 04 Y:1988 | 04 | 1988 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $10,849 | $43,400 | Implemented |
TN0339 # 05 Y:1988 | 05 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,180 | $600 | Implemented |
TN0339 # 06 Y:1988 | 06 | 1988 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $7,585 | $10,200 | Not Implemented |
TN0339 # 07 Y:1988 | 07 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,687 | $1,379 | Implemented |
TN0339 # 08 Y:1988 | 08 | 1988 | LOWER LIGHT FIXTURES IN HIGH CEILING AREAS | $5,476 | $13,845 | Not Implemented |
TN0339 # 09 Y:1988 | 09 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,706 | $0 | Implemented |
TN0339 # 10 Y:1988 | 10 | 1988 | INSULATE BARE EQUIPMENT | $1,857 | $2,148 | Not Implemented |
TN0339 # 11 Y:1988 | 11 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,909 | $240 | Implemented |
TN0339 # 12 Y:1988 | 12 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,187 | $645 | Not Implemented |
TN0339 # 13 Y:1988 | 13 | 1988 | IMPROVE LUBRICATION PRACTICES | $475 | $150 | Implemented |
TN0339 # 14 Y:1988 | 14 | 1988 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $348 | $615 | Not Implemented |