Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0890 # 05 Y:2012 | 05 | 2012 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $12,607 | $6,000 | Not Implemented |
UMS004 # 01 Y:2012 | 01 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $200,000 | $200,000 | Not Implemented |
UMS004 # 02 Y:2012 | 02 | 2012 | CONVERT TO OXYFUEL BURNERS | $156,000 | $250,000 | Not Implemented |
UMS004 # 03 Y:2012 | 03 | 2012 | COVER OPEN TANKS | $41,000 | $32,000 | Not Implemented |
UMS004 # 04 Y:2012 | 04 | 2012 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $27,600 | $75,000 | Not Implemented |
UMS004 # 05 Y:2012 | 05 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,500 | $0 | Not Implemented |
UMS004 # 06 Y:2012 | 06 | 2012 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $40,000 | $40,000 | Not Implemented |
UMS004 # 07 Y:2012 | 07 | 2012 | SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS | $1,300 | $0 | Not Implemented |
MAS015 # 01 Y:2012 | 01 | 2012 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $3,716 | $4,442 | Not Implemented |
MAS015 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,906 | $9,000 | Not Implemented |
MAS015 # 03 Y:2012 | 03 | 2012 | SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS | $1,535 | $3,900 | Not Implemented |
NC0443 # 01 Y:2012 | 01 | 2012 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $24,834 | $105,200 | Not Implemented |
NC0443 # 02 Y:2012 | 02 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $9,610 | $27,000 | Not Implemented |
NC0443 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,514 | $500 | Not Implemented |
NC0443 # 04 Y:2012 | 04 | 2012 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,960 | $10,175 | Not Implemented |
NC0443 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $633 | $2,440 | Not Implemented |
NC0443 # 06 Y:2012 | 06 | 2012 | MAKE ICE DURING OFF PEAK HOURS FOR COOLING | $28,327 | $96,000 | Not Implemented |
UD0849 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,282 | $15,816 | Not Implemented |
UD0849 # 02 Y:2012 | 02 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,445 | $0 | Not Implemented |
UD0849 # 03 Y:2012 | 03 | 2012 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,632 | $0 | Not Implemented |
UD0849 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,199 | $500 | Not Implemented |
UD0849 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,530 | $1,000 | Not Implemented |
UD0849 # 06 Y:2012 | 06 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $34,045 | $44,000 | Not Implemented |
UD0849 # 07 Y:2012 | 07 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $7,241 | $11,000 | Not Implemented |
UD0849 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,274 | $2,000 | Not Implemented |