Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0401 # 02 Y:1993 | 02 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,229 | $12,281 | Implemented |
OK0401 # 03 Y:1993 | 03 | 1993 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $1,081 | $69 | Implemented |
OK0401 # 04 Y:1993 | 04 | 1993 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,239 | $11,720 | Not Implemented |
OK0401 # 05 Y:1993 | 05 | 1993 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $352 | $168 | Implemented |
OK0401 # 06 Y:1993 | 06 | 1993 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $21,033 | $8,169 | Not Implemented |
OK0401 # 07 Y:1993 | 07 | 1993 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $8,585 | $31,250 | Not Implemented |
OK0400 # 01 Y:1993 | 01 | 1993 | INSTALL SET-BACK TIMERS | $10,933 | $1,316 | Implemented |
OK0400 # 02 Y:1993 | 02 | 1993 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,801 | $2,000 | Not Implemented |
OK0400 # 03 Y:1993 | 03 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $925 | $192 | Not Implemented |
OK0400 # 04 Y:1993 | 04 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $653 | $0 | Implemented |
OK0400 # 05 Y:1993 | 05 | 1993 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $229 | $0 | Implemented |
OK0400 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $188 | $258 | Implemented |
OK0399 # 01 Y:1993 | 01 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $662 | $0 | Implemented |
OK0399 # 02 Y:1993 | 02 | 1993 | RECOVER WASTE HEAT FROM EQUIPMENT | $133 | $452 | Not Implemented |
OK0399 # 03 Y:1993 | 03 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,239 | $3,560 | Implemented |
OK0399 # 04 Y:1993 | 04 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $829 | $546 | Implemented |
OK0399 # 05 Y:1993 | 05 | 1993 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,137 | $0 | Implemented |
OK0399 # 06 Y:1993 | 06 | 1993 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,418 | $10,680 | Implemented |
OK0399 # 07 Y:1993 | 07 | 1993 | INSTALL OCCUPANCY SENSORS | $416 | $100 | Not Implemented |
OK0399 # 08 Y:1993 | 08 | 1993 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $743 | $880 | Implemented |
OK0399 # 09 Y:1993 | 09 | 1993 | TURN OFF EQUIPMENT WHEN NOT IN USE | $644 | $0 | Implemented |
OK0399 # 10 Y:1993 | 10 | 1993 | USE POWER DURING OFF-PEAK PERIODS | $10,811 | $0 | Not Implemented |
OK0399 # 11 Y:1993 | 11 | 1993 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $16,570 | $0 | Not Implemented |
OK0396 # 01 Y:1993 | 01 | 1993 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $3,199 | $8,100 | Implemented |
OK0396 # 02 Y:1993 | 02 | 1993 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,139 | $80 | Implemented |