IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0401 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,229 $12,281 Implemented
OK0401 # 03 Y:1993 03 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,081 $69 Implemented
OK0401 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,239 $11,720 Not Implemented
OK0401 # 05 Y:1993 05 1993 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $352 $168 Implemented
OK0401 # 06 Y:1993 06 1993 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $21,033 $8,169 Not Implemented
OK0401 # 07 Y:1993 07 1993 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $8,585 $31,250 Not Implemented
OK0400 # 01 Y:1993 01 1993 INSTALL SET-BACK TIMERS $10,933 $1,316 Implemented
OK0400 # 02 Y:1993 02 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,801 $2,000 Not Implemented
OK0400 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $925 $192 Not Implemented
OK0400 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $653 $0 Implemented
OK0400 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229 $0 Implemented
OK0400 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $188 $258 Implemented
OK0399 # 01 Y:1993 01 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $662 $0 Implemented
OK0399 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $133 $452 Not Implemented
OK0399 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,239 $3,560 Implemented
OK0399 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $829 $546 Implemented
OK0399 # 05 Y:1993 05 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,137 $0 Implemented
OK0399 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,418 $10,680 Implemented
OK0399 # 07 Y:1993 07 1993 INSTALL OCCUPANCY SENSORS $416 $100 Not Implemented
OK0399 # 08 Y:1993 08 1993 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $743 $880 Implemented
OK0399 # 09 Y:1993 09 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $644 $0 Implemented
OK0399 # 10 Y:1993 10 1993 USE POWER DURING OFF-PEAK PERIODS $10,811 $0 Not Implemented
OK0399 # 11 Y:1993 11 1993 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $16,570 $0 Not Implemented
OK0396 # 01 Y:1993 01 1993 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,199 $8,100 Implemented
OK0396 # 02 Y:1993 02 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,139 $80 Implemented