Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
27,484
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0625 # 09 Y:2024 | 09 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,307 | $15,295 | n/a |
SF0625 # 10 Y:2024 | 10 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,369 | $7,928 | n/a |
SF0625 # 11 Y:2024 | 11 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $177,385 | $2,104,448 | n/a |
UL2412 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $30,391 | $318,570 | n/a |
UL2412 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,324 | $627 | n/a |
UL2412 # 03 Y:2024 | 03 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,217 | $13,000 | n/a |
AS0589 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $61,574 | $440,495 | n/a |
AS0589 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,677 | $6,857 | n/a |
AS0589 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,087 | $70 | n/a |
AS0589 # 04 Y:2024 | 04 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $548 | $747 | n/a |
AS0589 # 05 Y:2024 | 05 | 2024 | INSTALL HEAT PIPES / RAISE COOLING SETPOINT | $234 | $80 | n/a |
DL0243 # 01 Y:2024 | 01 | 2024 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $8,211 | $64,000 | n/a |
DL0243 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,139 | $51,000 | n/a |
DL0243 # 03 Y:2024 | 03 | 2024 | ELIMINATE/REDUCE AN OPERATION | $2,346 | $520 | n/a |
LS2421 # 01 Y:2024 | 01 | 2024 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $33,742 | $15,900 | Not Implemented |
LS2421 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $8,504 | $12,500 | Implemented |
LS2421 # 03 Y:2024 | 03 | 2024 | USE OTHER WASTE CONCENTRATION METHODS | $590,512 | $783,539 | Implemented |
LS2421 # 04 Y:2024 | 04 | 2024 | INSTALL WIND POWERED ELECTRIC GENERATOR | $148,851 | $560,000 | Not Implemented |
LS2421 # 05 Y:2024 | 05 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $21,228 | $141,000 | Not Implemented |
MU0054 # 01 Y:2024 | 01 | 2024 | USE OPTIMUM TEMPERATURE | $6,955 | $0 | Not Implemented |
MU0054 # 02 Y:2024 | 02 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,402 | $28,100 | Not Implemented |
MU0054 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,874 | $0 | Not Implemented |
MU0054 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,876 | $1,801 | Not Implemented |
MU0054 # 05 Y:2024 | 05 | 2024 | INSTALL OCCUPANCY SENSORS | $1,296 | $0 | Not Implemented |
MU0054 # 06 Y:2024 | 06 | 2024 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $118 | $272 | Not Implemented |