IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,420

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0975 # 07 Y:2024 07 2024 MINIMIZE WATER USAGE $64,161 $237,800 Implemented
OR0786 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,491 $0 Implemented
OR0786 # 02 Y:2024 02 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,522 $2,500 Implemented
OR0786 # 03 Y:2024 03 2024 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,567 $726 Implemented
OR0786 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $7,048 $108,930 Implemented
OK1110 # 01 Y:2024 01 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,945 $56,850 Implemented
OK1110 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $3,264 $1,330 Implemented
OK1110 # 03 Y:2024 03 2024 OPTIMIZE PLANT POWER FACTOR $5,873 $7,892 Not Implemented
OK1110 # 04 Y:2024 04 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $30,588 $280,800 Not Implemented
OK1110 # 05 Y:2024 05 2024 OPERATE BOILERS ON HIGH FIRE SETTING $8,594 $22,000 Implemented
OK1110 # 06 Y:2024 06 2024 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,219 $12,400 Not Implemented
OK1110 # 07 Y:2024 07 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $2,681 $1,861 Implemented
OK1110 # 08 Y:2024 08 2024 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $996 $160 Implemented
LS0524 # 01 Y:2024 01 2024 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $5,077 $2,040 Implemented
LS0524 # 02 Y:2024 02 2024 INSTALL OCCUPANCY SENSORS $340 $200 Implemented
LS0524 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $620 $578 Implemented
SD0655 # 01 Y:2024 01 2024 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,382 $8,850 Not Implemented
SD0655 # 02 Y:2024 02 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,218 $7,799 Not Implemented
SD0655 # 03 Y:2024 03 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,849 $5,725 Not Implemented
SD0655 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,987 $2,109 Not Implemented
SD0655 # 05 Y:2024 05 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,570 $42,732 Not Implemented
SD0655 # 06 Y:2024 06 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $47,700 $5,600 Not Implemented
SD0655 # 07 Y:2024 07 2024 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $2,721 $5,005 Not Implemented
SJ0017 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $184,626 $998,282 Not Implemented
SJ0017 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,795 $0 Not Implemented