Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0104 # 04 Y:2001 | 04 | 2001 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $8,614 | $20,500 | Not Implemented |
SU0104 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $30 | $79 | Not Implemented |
SU0121 # 01 Y:2001 | 01 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,756 | $450 | Not Implemented |
SU0121 # 02 Y:2001 | 02 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $508 | $945 | Implemented |
SU0121 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $1,001 | $69 | Implemented |
SU0121 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,452 | $0 | Implemented |
SU0121 # 05 Y:2001 | 05 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $1,638 | $271 | Not Implemented |
SU0121 # 06 Y:2001 | 06 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $508 | $230 | Implemented |
SU0125 # 01 Y:2001 | 01 | 2001 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $1,561 | $0 | Implemented |
SU0125 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,467 | $0 | Implemented |
SU0125 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,122 | $20,070 | Implemented |
SU0125 # 04 Y:2001 | 04 | 2001 | INSTALL OCCUPANCY SENSORS | $2,096 | $665 | Not Implemented |
SU0125 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,687 | $342 | Not Implemented |
SU0125 # 06 Y:2001 | 06 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,313 | $840 | Not Implemented |
SU0125 # 07 Y:2001 | 07 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $920 | $3,275 | Not Implemented |
SU0125 # 08 Y:2001 | 08 | 2001 | OPTIMIZE PLANT POWER FACTOR | $4,470 | $6,200 | Implemented |
SU0125 # 09 Y:2001 | 09 | 2001 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,312 | $0 | Implemented |
SU0125 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $8,216 | $9,990 | Not Implemented |
SU0125 # 11 Y:2001 | 11 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,719 | $760 | Implemented |
SU0117 # 01 Y:2001 | 01 | 2001 | ELIMINATE/REDUCE AN OPERATION | $7,264 | $8,085 | Not Implemented |
SU0117 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $768 | $0 | Implemented |
SU0117 # 03 Y:2001 | 03 | 2001 | INSTALL AN UNINTERUPTABLE POWER SUPPLY | $153,410 | $531,678 | Not Implemented |
SU0117 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $12,307 | $30,550 | Not Implemented |
SU0117 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,845 | $158 | Implemented |
SU0117 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,016 | $0 | Not Implemented |