IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,875

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SU0104 # 04 Y:2001 04 2001 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $8,614 $20,500 Not Implemented
SU0104 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $30 $79 Not Implemented
SU0121 # 01 Y:2001 01 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,756 $450 Not Implemented
SU0121 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $508 $945 Implemented
SU0121 # 03 Y:2001 03 2001 INSULATE BARE EQUIPMENT $1,001 $69 Implemented
SU0121 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,452 $0 Implemented
SU0121 # 05 Y:2001 05 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $1,638 $271 Not Implemented
SU0121 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $508 $230 Implemented
SU0125 # 01 Y:2001 01 2001 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,561 $0 Implemented
SU0125 # 02 Y:2001 02 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,467 $0 Implemented
SU0125 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,122 $20,070 Implemented
SU0125 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $2,096 $665 Not Implemented
SU0125 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,687 $342 Not Implemented
SU0125 # 06 Y:2001 06 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,313 $840 Not Implemented
SU0125 # 07 Y:2001 07 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $920 $3,275 Not Implemented
SU0125 # 08 Y:2001 08 2001 OPTIMIZE PLANT POWER FACTOR $4,470 $6,200 Implemented
SU0125 # 09 Y:2001 09 2001 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $34,312 $0 Implemented
SU0125 # 10 Y:2001 10 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,216 $9,990 Not Implemented
SU0125 # 11 Y:2001 11 2001 RECOVER WASTE HEAT FROM EQUIPMENT $10,719 $760 Implemented
SU0117 # 01 Y:2001 01 2001 ELIMINATE/REDUCE AN OPERATION $7,264 $8,085 Not Implemented
SU0117 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $768 $0 Implemented
SU0117 # 03 Y:2001 03 2001 INSTALL AN UNINTERUPTABLE POWER SUPPLY $153,410 $531,678 Not Implemented
SU0117 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $12,307 $30,550 Not Implemented
SU0117 # 05 Y:2001 05 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,845 $158 Implemented
SU0117 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,016 $0 Not Implemented