Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CO0462 # 04 Y:2000 | 04 | 2000 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,340 | $1,390 | Not Implemented |
CO0462 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $830 | $470 | Not Implemented |
CO0462 # 06 Y:2000 | 06 | 2000 | CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS | $9,460 | $2,000 | Not Implemented |
CO0462 # 07 Y:2000 | 07 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $660 | $0 | Not Implemented |
HO0228 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,864 | $8,232 | Implemented |
HO0228 # 02 Y:2000 | 02 | 2000 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,158 | $0 | Implemented |
HO0228 # 03 Y:2000 | 03 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $455 | $1,000 | Not Implemented |
HO0228 # 04 Y:2000 | 04 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $538 | $15 | Implemented |
HO0228 # 05 Y:2000 | 05 | 2000 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,054 | $200 | Implemented |
HO0228 # 06 Y:2000 | 06 | 2000 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $1,810 | $778 | Implemented |
HO0228 # 07 Y:2000 | 07 | 2000 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $9,360 | $5,000 | Implemented |
HO0228 # 08 Y:2000 | 08 | 2000 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $9,360 | $25,000 | Not Implemented |
HO0228 # 09 Y:2000 | 09 | 2000 | IMPROVE SPACE COMFORT CONDITIONING | $2,880 | $2,340 | Implemented |
HO0228 # 10 Y:2000 | 10 | 2000 | PURCHASE MATERIAL FROM SUPPLIER IN CUSTOMIZED PACKAGING | $10,395 | $3,000 | Implemented |
HO0228 # 11 Y:2000 | 11 | 2000 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $68,250 | $300,000 | Implemented |
HO0228 # 12 Y:2000 | 12 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,440 | $1,500 | Implemented |
HO0228 # 13 Y:2000 | 13 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $6,240 | $2,500 | Not Implemented |
HO0228 # 14 Y:2000 | 14 | 2000 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $39,000 | $6,000 | Implemented |
HO0228 # 15 Y:2000 | 15 | 2000 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $3,456 | $6,500 | Not Implemented |
HO0228 # 16 Y:2000 | 16 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $780 | $750 | Not Implemented |
HO0228 # 17 Y:2000 | 17 | 2000 | REDUCE OR ELIMINATE WASTE | $8,250 | $0 | Implemented |
OD0159 # 01 Y:2000 | 01 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,620 | $16,760 | n/a |
OD0159 # 02 Y:2000 | 02 | 2000 | INSTALL OCCUPANCY SENSORS | $1,673 | $380 | n/a |
OD0159 # 03 Y:2000 | 03 | 2000 | INSTALL SKYLIGHTS | $473 | $100 | n/a |
OD0159 # 04 Y:2000 | 04 | 2000 | REPAIR AND ELIMINATE STEAM LEAKS | $1,871 | $680 | n/a |