IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0302 # 03 Y:2005 03 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $337 $748 Not Implemented
SF0302 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $474 $1,638 Implemented
SF0302 # 05 Y:2005 05 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $600 $2,584 Implemented
SF0302 # 06 Y:2005 06 2005 UPGRADE CONTROLS ON COMPRESSORS $2,069 $15,913 Not Implemented
SF0302 # 07 Y:2005 07 2005 REUSE / RECYCLE/ SELL RUBBER PRODUCTS $1,800 $250 Implemented
SF0302 # 08 Y:2005 08 2005 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE $1,200 $0 Implemented
UM0278 # 01 Y:2005 01 2005 COVER OPEN TANKS $33,962 $480 Implemented
UM0278 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,116 $2,200 Implemented
UM0278 # 03 Y:2005 03 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,140 $3,000 Not Implemented
UM0278 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $618 $184 Implemented
UM0278 # 05 Y:2005 05 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $333 $850 Not Implemented
IA0361 # 01 Y:2005 01 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $781 $25 Not Implemented
IA0361 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,729 $429 Implemented
IA0361 # 03 Y:2005 03 2005 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $919 $172 Implemented
IA0361 # 04 Y:2005 04 2005 RECOVER WASTE HEAT FROM EQUIPMENT $2,960 $1,114 Implemented
IA0361 # 05 Y:2005 05 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $421 $850 Implemented
IA0361 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $577 $1,080 Not Implemented
MA0571 # 01 Y:2005 01 2005 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $97,224 $319,500 Not Implemented
MA0571 # 02 Y:2005 02 2005 RECOVER WASTE HEAT FROM EQUIPMENT $46,372 $49,355 Implemented
MA0571 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,977 $25,856 Implemented
MA0571 # 04 Y:2005 04 2005 USE MINIMUM SAFE OVEN VENTILATION $7,370 $1,900 Implemented
MA0571 # 05 Y:2005 05 2005 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $6,826 $29,170 Implemented
MA0571 # 06 Y:2005 06 2005 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,702 $1,962 Not Implemented
MA0571 # 07 Y:2005 07 2005 OPTIMIZE PLANT POWER FACTOR $735 $1,450 Not Implemented
IC0095 # 01 Y:2005 01 2005 USE IMMERSION HEATING IN TANKS, MELTING POTS, ETC $30,106 $55,000 Not Implemented