IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0461 # 02 Y:2013 02 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $857,166 $2,630,000 Not Implemented
SD0461 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,350 $106,000 Not Implemented
SD0461 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,519 $18,224 Implemented
SD0461 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $6,329 $3,400 Implemented
SD0461 # 06 Y:2013 06 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,607 $4,865 Not Implemented
SF0426 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,719 $0 Not Implemented
SF0426 # 02 Y:2013 02 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,686 $0 Not Implemented
SF0426 # 03 Y:2013 03 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $8,403 $649 Not Implemented
SF0426 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,301 $7,526 Not Implemented
SF0426 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $373 $1,619 Not Implemented
SF0426 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,979 $17,191 Implemented
LE0351 # 01 Y:2013 01 2013 INSTALL OCCUPANCY SENSORS $5,155 $7,480 Implemented
LE0351 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,415 $4,700 Not Implemented
LE0351 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,220 $6,540 Implemented
LE0351 # 04 Y:2013 04 2013 UPGRADE OBSOLETE EQUIPMENT $3,863 $10,000 Implemented
LE0351 # 05 Y:2013 05 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,503 $240 Not Implemented
AM0632 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $33,800 $3,800 Implemented
AM0632 # 02 Y:2013 02 2013 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $11,000 $600 Implemented
AM0632 # 03 Y:2013 03 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,350 $3,440 Not Implemented
AM0632 # 04 Y:2013 04 2013 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,900 $0 Implemented
AM0632 # 05 Y:2013 05 2013 USE SYNTHETIC LUBRICANT $1,105 $0 Not Implemented
AM0632 # 06 Y:2013 06 2013 MINIMIZE WATER USAGE $788 $1,088 Implemented
AM0632 # 07 Y:2013 07 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $687 $1,374 Not Implemented
OK0841 # 01 Y:2013 01 2013 RECOVER WASTE HEAT FROM EQUIPMENT $44,134 $43,500 Not Implemented
OK0841 # 02 Y:2013 02 2013 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $68,923 $4,000 Not Implemented