Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,969
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0795 # 02 Y:2018 | 02 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,287 | $200 | Not Implemented |
MA0795 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $6,779 | $911 | Not Implemented |
MA0795 # 04 Y:2018 | 04 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $687 | $2,512 | Implemented |
MA0794 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $84,640 | $121,500 | Implemented |
MA0794 # 02 Y:2018 | 02 | 2018 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $14,204 | $51,700 | Not Implemented |
MA0794 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $2,123 | $4,092 | Not Implemented |
MA0794 # 04 Y:2018 | 04 | 2018 | INSTALL TIMERS AND/OR THERMOSTATS | $1,216 | $852 | Implemented |
MA0794 # 05 Y:2018 | 05 | 2018 | RECOVER WASTE HEAT FROM EQUIPMENT | $710 | $2,583 | Not Implemented |
MA0793 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $34,323 | $28,940 | Not Implemented |
MA0793 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,582 | $5,974 | Implemented |
MA0793 # 03 Y:2018 | 03 | 2018 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,289 | $5,525 | Not Implemented |
MA0793 # 04 Y:2018 | 04 | 2018 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,522 | $1,000 | Not Implemented |
MA0793 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,012 | $500 | Implemented |
MA0793 # 06 Y:2018 | 06 | 2018 | REDUCE VENTILATION AIR | $419 | $1,000 | Not Implemented |
MA0792 # 01 Y:2018 | 01 | 2018 | REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE | $158,611 | $1,000,000 | Not Implemented |
MA0792 # 02 Y:2018 | 02 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,850 | $16,551 | Implemented |
MA0792 # 03 Y:2018 | 03 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,711 | $9,925 | Implemented |
MA0792 # 04 Y:2018 | 04 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,744 | $3,340 | Not Implemented |
MA0791 # 01 Y:2018 | 01 | 2018 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $74,318 | $264,000 | Not Implemented |
MA0791 # 02 Y:2018 | 02 | 2018 | LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE | $16,275 | $1,000 | Not Implemented |
MA0791 # 03 Y:2018 | 03 | 2018 | INSULATE BARE EQUIPMENT | $1,313 | $238 | Implemented |
MA0791 # 04 Y:2018 | 04 | 2018 | ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS | $974 | $1,000 | Implemented |
MA0791 # 05 Y:2018 | 05 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $434 | $200 | Not Implemented |
MA0789 # 01 Y:2018 | 01 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,415 | $29,288 | Implemented |
MA0789 # 02 Y:2018 | 02 | 2018 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $9,053 | $960 | Not Implemented |