IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

625

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0315 # 02 Y:2017 02 2017 REPLACE BOILER $28,850 $36,000 Implemented
MI0315 # 03 Y:2017 03 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $23,532 $1,560 Not Implemented
MI0315 # 04 Y:2017 04 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $18,687 $960 Implemented
MI0315 # 05 Y:2017 05 2017 USE OPTIMUM THICKNESS INSULATION $10,994 $1,320 Not Implemented
MI0315 # 06 Y:2017 06 2017 INSTALL OCCUPANCY SENSORS $9,833 $434 Implemented
MI0315 # 07 Y:2017 07 2017 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $6,476 $6,800 Implemented
MI0315 # 08 Y:2017 08 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,093 $5,340 Implemented
MI0312 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,284 $33,139 Implemented
MI0312 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $11,092 $31,500 Not Implemented
MI0312 # 03 Y:2017 03 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $9,806 $3,600 Implemented
MI0312 # 04 Y:2017 04 2017 INSTALL OCCUPANCY SENSORS $9,922 $1,995 Implemented
MI0312 # 05 Y:2017 05 2017 USE PHOTOCELL CONTROLS $9,752 $8,000 Implemented
MI0312 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,631 $5,377 Not Implemented
MI0312 # 07 Y:2017 07 2017 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,544 $19,300 Implemented
MI0312 # 08 Y:2017 08 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,938 $960 Implemented
MI0312 # 09 Y:2017 09 2017 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $4,535 $580 Not Implemented
MI0312 # 10 Y:2017 10 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,241 $1,660 Implemented
MI0311 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $97,830 $1,660 Implemented
MI0311 # 02 Y:2017 02 2017 UTILIZE A LESS EXPENSIVE COOLING METHOD $33,524 $10,000 Not Implemented
MI0311 # 03 Y:2017 03 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $28,589 $4,520 Implemented
MI0311 # 04 Y:2017 04 2017 OPTIMIZE PLANT POWER FACTOR $27,970 $22,300 Not Implemented
MI0311 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,644 $21,418 Implemented
MI0311 # 06 Y:2017 06 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $19,177 $1,440 Implemented
MI0311 # 07 Y:2017 07 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,449 $10,720 Implemented
MI0311 # 08 Y:2017 08 2017 USE PHOTOCELL CONTROLS $938 $342 Implemented