Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0545 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,889 | $30,733 | Implemented |
NC0545 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $468 | $278 | Implemented |
NC0545 # 11 Y:2015 | 11 | 2015 | INSTALL OCCUPANCY SENSORS | $261 | $497 | Not Implemented |
NC0545 # 12 Y:2015 | 12 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $189 | $48 | Implemented |
NC0545 # 13 Y:2015 | 13 | 2015 | USE PHOTOCELL CONTROLS | $1,636 | $700 | Not Implemented |
NC0545 # 14 Y:2015 | 14 | 2015 | REDUCE FLUID FLOW RATES | $8,008 | $11,000 | Not Implemented |
NC0545 # 15 Y:2015 | 15 | 2015 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $5,331 | $14,100 | Not Implemented |
NC0545 # 16 Y:2015 | 16 | 2015 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $192 | $221 | Not Implemented |
NC0545 # 17 Y:2015 | 17 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $218 | $100 | Not Implemented |
NC0545 # 18 Y:2015 | 18 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $1,205 | $4,256 | Implemented |
NC0545 # 19 Y:2015 | 19 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,003 | $93 | Not Implemented |
NC0543 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $64,078 | $68,997 | Implemented |
NC0543 # 02 Y:2015 | 02 | 2015 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $28,971 | $40,000 | Not Implemented |
NC0543 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,402 | $100 | Implemented |
NC0543 # 04 Y:2015 | 04 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,041 | $10,000 | Not Implemented |
NC0543 # 05 Y:2015 | 05 | 2015 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $7,738 | $6,000 | Not Implemented |
NC0543 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,805 | $100 | Implemented |
NC0543 # 07 Y:2015 | 07 | 2015 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $9,398 | $21,800 | Not Implemented |
NC0543 # 08 Y:2015 | 08 | 2015 | MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION | $192 | $500 | Implemented |
NC0543 # 09 Y:2015 | 09 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $311 | $80 | Implemented |
NC0543 # 10 Y:2015 | 10 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,618 | $20,000 | Not Implemented |
NC0543 # 11 Y:2015 | 11 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,491 | $4,256 | Not Implemented |
NC0543 # 12 Y:2015 | 12 | 2015 | USE EVAPORATION TO CONCENTRATE MATERIAL | $4,794 | $19,000 | Not Implemented |
NC0542 # 01 Y:2015 | 01 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,174 | $20,250 | Implemented |
NC0542 # 02 Y:2015 | 02 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,264 | $200 | Implemented |