IAC logo
IAC Assessment: NC0548
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NC0548
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center North Carolina State
Assessment Year 2015
Principal Product Chillers
NAICS 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585 - Refrigeration And Heating Equipment
Sales $100,000,000-$500,000,000
# of Employees 465
Plant Area (Sq.Ft.) 600,000
Annual Production 2,330 Pieces
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $922,100 14,587,740 kWh $0.06
Electricity Demand $194,200 53,677 kW-months/year $3.62
Natural Gas $269,302 52,354 MMBtu $5.14
TOTAL ENERGY COSTS $1,385,602
RECOMMENDED SAVINGS* $59,266 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,174
#|Description Savings
Cost
Status Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost
$ kWh $ MMBtu $ $ $ $
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,830
Cost:
$85,000
- - $23,830 4,636 - - - - -
-
kWh
$23,830
4,636
MMBtu
-
-
$
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$13,922
Cost:
$5,000
$13,922 - - - - - - - $13,922
-
kWh
-
-
MMBtu
-
-
$
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,958
Cost:
$6,100
$3,958 62,832 - - - - - - $3,958
62,832
kWh
-
-
MMBtu
-
-
$
-
-
$
04: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER Savings:
$4,478
Cost:
$7,000
- - $4,478 871 - - - - -
-
kWh
$4,478
871
MMBtu
-
-
$
-
-
$
05: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$6,019
Cost:
$1,500
- - $6,019 1,171 - - - - -
-
kWh
$6,019
1,171
MMBtu
-
-
$
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,418
Cost:
$7,500
$1,418 22,500 - - - - - - $1,418
22,500
kWh
-
-
MMBtu
-
-
$
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$708
Cost:
$100
$1,128 17,904 - - $(-300) - $(-120) - $1,128
17,904
kWh
-
-
MMBtu
$(-300)
-
$
$(-120)
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,444
Cost:
$100
$1,444 22,920 - - - - - - $1,444
22,920
kWh
-
-
MMBtu
-
-
$
-
-
$
09: 2.4151 DEVELOP A REPAIR/REPLACE POLICY Savings:
$1,904
Cost:
$4,258
$1,904 30,221 - - - - - - $1,904
30,221
kWh
-
-
MMBtu
-
-
$
-
-
$
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,585
Cost:
$281
$1,585 25,154 - - - - - - $1,585
25,154
kWh
-
-
MMBtu
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$59,266
Cost:
$116,839
$25,359 181,531 $34,327 6,678 $(-300) - $(-120) - $25,359
181,531
kWh
$34,327
6,678
MMBtu
$(-300)
-
$
$(-120)
-
$
TOTAL IMPLEMENTED Savings:
$14,174
Cost:
$12,239
$8,575 136,111 $6,019 1,171 $(-300) - $(-120) - $8,575
136,111
kWh
$6,019
1,171
MMBtu
$(-300)
-
$
$(-120)
-
$
Savings
Cost
$ kWh $ MMBtu $ $ $ $
Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost Electricity Usage Natural Gas Personnel Changes Ancillary Material Cost