Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0109 # 01 Y:2006 | 01 | 2006 | OPTIMIZE PLANT POWER FACTOR | $1,800 | $2,220 | Not Implemented |
UU0109 # 02 Y:2006 | 02 | 2006 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $24,880 | $20,000 | Not Implemented |
UU0109 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,730 | $970 | Not Implemented |
UU0109 # 04 Y:2006 | 04 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,040 | $90 | Not Implemented |
UU0109 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,360 | $2,960 | Not Implemented |
UU0109 # 06 Y:2006 | 06 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $32,510 | $249,000 | Not Implemented |
MS0305 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $48,733 | $70,000 | Not Implemented |
MS0305 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,385 | $16,886 | Implemented |
MS0305 # 03 Y:2006 | 03 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,851 | $244 | Implemented |
IC0121 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $17,152 | $4,984 | Implemented |
IC0121 # 02 Y:2006 | 02 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,664 | $700 | Implemented |
IC0121 # 03 Y:2006 | 03 | 2006 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $8,928 | $9,302 | Not Implemented |
IC0121 # 04 Y:2006 | 04 | 2006 | INSTALL TURBULATORS | $7,715 | $23,253 | Not Implemented |
IC0121 # 05 Y:2006 | 05 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $20,185 | $115,000 | Not Implemented |
IC0121 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $440 | $1,664 | Implemented |
IC0121 # 07 Y:2006 | 07 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $18,627 | $88,113 | Not Implemented |
IC0121 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,394 | $27,491 | Implemented |
IC0121 # 09 Y:2006 | 09 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $7,933 | $89,400 | Not Implemented |
IA0400 # 01 Y:2006 | 01 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,532 | $1,864 | Not Implemented |
IA0400 # 02 Y:2006 | 02 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,097 | $900 | Not Implemented |
IA0400 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,029 | $32,168 | Not Implemented |
IA0400 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,976 | $16,842 | Not Implemented |
IA0400 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $936 | $0 | Not Implemented |
IA0400 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,212 | $553 | Not Implemented |
IA0400 # 07 Y:2006 | 07 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,373 | $2,000 | Not Implemented |