IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0762 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $47,587 $19,980 Implemented
MA0762 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,640 $13,585 Implemented
MA0762 # 07 Y:2016 07 2016 INSULATE BARE EQUIPMENT $6,359 $2,631 Not Implemented
MA0762 # 08 Y:2016 08 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $12,943 $100 Not Implemented
MA0762 # 09 Y:2016 09 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $6,192 $4,000 Not Implemented
MA0762 # 10 Y:2016 10 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,185 $7,200 Not Implemented
MI0304 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $48,914 $119,809 Implemented
MI0304 # 02 Y:2016 02 2016 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $30,447 $53,372 Implemented
MI0304 # 03 Y:2016 03 2016 UTILIZE A LESS EXPENSIVE COOLING METHOD $16,987 $25,335 Not Implemented
MI0304 # 04 Y:2016 04 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,015 $1,700 Implemented
MI0304 # 05 Y:2016 05 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,470 $43,770 Implemented
MI0304 # 06 Y:2016 06 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,388 $8,320 Implemented
MI0304 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,723 $4,691 Not Implemented
MI0304 # 08 Y:2016 08 2016 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,720 $2,320 Not Implemented
MI0304 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,968 $7,680 Implemented
MI0304 # 10 Y:2016 10 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,936 $2,430 Not Implemented
MI0304 # 11 Y:2016 11 2016 INSTALL OCCUPANCY SENSORS $1,803 $662 Implemented
MI0304 # 12 Y:2016 12 2016 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,779 $3,350 Implemented
MI0304 # 13 Y:2016 13 2016 USE PHOTOCELL CONTROLS $1,570 $1,120 Not Implemented
IP0074 # 01 Y:2016 01 2016 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $6,256 $0 Not Implemented
IP0074 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,888 $292 Implemented
IP0074 # 03 Y:2016 03 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $833 $4 Not Implemented
IP0074 # 04 Y:2016 04 2016 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $13,398 $951 Implemented
IP0074 # 05 Y:2016 05 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,366 $308 Implemented
IP0074 # 06 Y:2016 06 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $473 $101 Implemented