IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,102

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0648 # 04 Y:2024 04 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $113,272 $30,051 Implemented
SD0648 # 05 Y:2024 05 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $824,443 $529,751 Not Implemented
SD0648 # 06 Y:2024 06 2024 USE BATTERY STORAGE FOR DEMAND CONTROL $409,025 $0 Not Implemented
SD0648 # 07 Y:2024 07 2024 INSTALL TIMERS AND/OR THERMOSTATS $35,974 $2,600 Implemented
SD0648 # 08 Y:2024 08 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $14,384 $2,234 Implemented
SD0648 # 09 Y:2024 09 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $364,878 $49,250 Not Implemented
SD0648 # 10 Y:2024 10 2024 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $2,121 $10,016 Implemented
SD0648 # 11 Y:2024 11 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,340 $15,608 Implemented
SD0648 # 12 Y:2024 12 2024 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $982,749 $783,575 Not Implemented
SD0648 # 13 Y:2024 13 2024 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $793 $1,336 Implemented
UD1072 # 01 Y:2024 01 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $5,741 $5,000 Implemented
UD1072 # 02 Y:2024 02 2024 INSTALL / REPAIR INSULATION ON STEAM LINES $3,199 $864 Implemented
UD1072 # 03 Y:2024 03 2024 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $63 $216 Implemented
UD1072 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,454 $952 Not Implemented
UD1072 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,892 $12,650 Implemented
UD1072 # 06 Y:2024 06 2024 INSTALL OCCUPANCY SENSORS $1,343 $1,667 Not Implemented
UD1072 # 07 Y:2024 07 2024 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $14,674 $67,830 Not Implemented
SJ0011 # 01 Y:2024 01 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $37,495 $51,522 Not Implemented
SJ0011 # 02 Y:2024 02 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,700 $28,158 Not Implemented
SJ0011 # 03 Y:2024 03 2024 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $787 $622 Not Implemented
SJ0011 # 04 Y:2024 04 2024 RECOVER WASTE HEAT FROM EQUIPMENT $4,268 $3,475 Not Implemented
SJ0011 # 05 Y:2024 05 2024 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,528 $468 Not Implemented
SJ0011 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $13 $71 Not Implemented
SJ0011 # 07 Y:2024 07 2024 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $1,389 $0 Implemented
SJ0011 # 08 Y:2024 08 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $207,539 $726,190 Not Implemented