IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,289

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0095 # 01 Y:1996 01 1996 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,105 $5,000 Implemented
NC0095 # 02 Y:1996 02 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $641 $0 Not Implemented
NC0095 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $549 $2,100 Not Implemented
NC0095 # 04 Y:1996 04 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,473 $6,046 Implemented
NC0095 # 05 Y:1996 05 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $195 $90 Implemented
NC0095 # 06 Y:1996 06 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $439 $400 Not Implemented
NC0095 # 07 Y:1996 07 1996 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $367 $367 Not Implemented
NC0095 # 08 Y:1996 08 1996 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,022 $320 Not Implemented
NC0095 # 09 Y:1996 09 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $38 $100 Not Implemented
NC0079 # 01 Y:1996 01 1996 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $190 $600 Not Implemented
NC0079 # 02 Y:1996 02 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $970 $60 Implemented
NC0079 # 03 Y:1996 03 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,578 $1,200 Not Implemented
NC0079 # 04 Y:1996 04 1996 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $1,117 $3,000 Not Implemented
NC0079 # 05 Y:1996 05 1996 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,234 $6,000 Not Implemented
NC0079 # 06 Y:1996 06 1996 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $13,641 $6,000 Not Implemented
NC0079 # 07 Y:1996 07 1996 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,705 $2,500 Not Implemented
NC0079 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,851 $200 Not Implemented
NC0081 # 01 Y:1996 01 1996 DISCONNECT BALLASTS $800 $2,060 Implemented
NC0081 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,438 $17,250 Implemented
NC0081 # 03 Y:1996 03 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,043 $53,739 Implemented
NC0081 # 04 Y:1996 04 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $558 $480 Implemented
NC0081 # 05 Y:1996 05 1996 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,626 $2,640 Implemented
NC0081 # 06 Y:1996 06 1996 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $9,258 $25,000 Implemented
NC0081 # 07 Y:1996 07 1996 AIR CONDITION ONLY SPACE NECESSARY $968 $1,500 Not Implemented
NC0081 # 08 Y:1996 08 1996 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,816 $0 Not Implemented