IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0170 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $295 $640 Not Implemented
MA0263 # 01 Y:1993 01 1993 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $2,400 $120 Implemented
MA0263 # 02 Y:1993 02 1993 RECOVER WASTE HEAT FROM EQUIPMENT $838 $1,562 Implemented
MA0263 # 03 Y:1993 03 1993 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $18 Not Implemented
MA0263 # 04 Y:1993 04 1993 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $557 $720 Not Implemented
MA0263 # 05 Y:1993 05 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $459 $1,800 Not Implemented
MA0263 # 06 Y:1993 06 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $207 $0 Implemented
MO0078 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,594 $17,057 Implemented
MO0078 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $247 $570 Not Implemented
MO0078 # 03 Y:1993 03 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,239 $963 Not Implemented
MO0078 # 04 Y:1993 04 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,688 $100 Not Implemented
MO0078 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,881 $30,661 Implemented
MO0078 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,518 $1,258 Implemented
MO0078 # 07 Y:1993 07 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,227 $995 Not Implemented
MO0078 # 08 Y:1993 08 1993 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $86,898 $300 Implemented
MO0078 # 09 Y:1993 09 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $13,722 $996 Not Implemented
AS0078 # 01 Y:1993 01 1993 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $167,933 $370,044 Not Implemented
AS0078 # 02 Y:1993 02 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $54,544 $70,044 Implemented
AS0078 # 03 Y:1993 03 1993 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $403 $1,200 Implemented
AS0078 # 04 Y:1993 04 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,061 $10,100 Not Implemented
AS0078 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,119 $0 Implemented
AS0078 # 06 Y:1993 06 1993 USE SYNTHETIC LUBRICANT $364 $0 Implemented
AS0078 # 07 Y:1993 07 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $219 $450 Not Implemented
UF0054 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,727 $3,429 Implemented
UF0054 # 02 Y:1993 02 1993 INSTALL SPECTRAL REFLECTORS / DELAMP $13,230 $26,355 Not Implemented