IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0396 # 05 Y:2005 05 2005 DIRECT WARMEST AIR TO COMBUSTION INTAKE $912 $1,000 Not Implemented
AS0396 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,302 $1,000 Not Implemented
AS0396 # 07 Y:2005 07 2005 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $8,063 $3,000 Not Implemented
UD0713 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $84,867 $94,373 Not Implemented
UD0713 # 02 Y:2005 02 2005 USE OPTIMUM TEMPERATURE $64,754 $2,500 Not Implemented
UD0713 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,435 $41,783 Implemented
UD0713 # 04 Y:2005 04 2005 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $15,628 $3,900 Not Implemented
UD0713 # 05 Y:2005 05 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $9,868 $22,600 Not Implemented
UD0713 # 06 Y:2005 06 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,925 $200 Implemented
UD0713 # 07 Y:2005 07 2005 DEVELOP A REPAIR/REPLACE POLICY $1,021 $3,807 Implemented
OK0703 # 01 Y:2005 01 2005 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $37,468 $34,300 Not Implemented
OK0703 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,044 $25,020 Implemented
OK0703 # 03 Y:2005 03 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,596 $39,180 Implemented
OK0703 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $53,659 $1,739 Not Implemented
OK0703 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $21,204 $1,727 Implemented
OK0703 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $9,018 $22,540 Implemented
OK0703 # 07 Y:2005 07 2005 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,250 $0 Not Implemented
OK0703 # 08 Y:2005 08 2005 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,564 $1,025 Not Implemented
WI0487 # 01 Y:2005 01 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,912 $11,200 Implemented
WI0487 # 02 Y:2005 02 2005 INSTALL SPECTRAL REFLECTORS / DELAMP $933 $0 Implemented
WI0487 # 03 Y:2005 03 2005 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,262 $5,600 Implemented
WI0487 # 04 Y:2005 04 2005 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,836 $780 Implemented
WI0487 # 05 Y:2005 05 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $714 $1,280 Implemented
WI0487 # 06 Y:2005 06 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $334 $400 Implemented
WI0487 # 07 Y:2005 07 2005 INSTALL TIMERS AND/OR THERMOSTATS $1,350 $1,200 Implemented