IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA0073 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,345 $7,808 Not Implemented
UA0073 # 02 Y:2012 02 2012 INSTALL OCCUPANCY SENSORS $428 $1,100 Implemented
UA0073 # 03 Y:2012 03 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,335 $28,658 Not Implemented
UA0073 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $3,261 $2,173 Implemented
UA0073 # 05 Y:2012 05 2012 ISOLATE HOT OR COLD EQUIPMENT $25,253 $12,880 Not Implemented
UD0848 # 01 Y:2012 01 2012 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $550 $1,000 Not Implemented
UD0848 # 02 Y:2012 02 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,519 $5,000 Implemented
UD0848 # 03 Y:2012 03 2012 MINIMIZE WATER USAGE $1,496 $1,000 Not Implemented
UD0848 # 04 Y:2012 04 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,458 $0 Not Implemented
UD0848 # 05 Y:2012 05 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $239 $0 Not Implemented
UD0848 # 06 Y:2012 06 2012 UTILIZE A LESS EXPENSIVE COOLING METHOD $3,962 $1,000 Not Implemented
UD0848 # 07 Y:2012 07 2012 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,543 $0 Implemented
UD0848 # 08 Y:2012 08 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,209 $1,000 Not Implemented
UD0848 # 09 Y:2012 09 2012 REDUCE VENTILATION AIR $882 $300 Implemented
UD0848 # 10 Y:2012 10 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $834 $600 Not Implemented
SF0407 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $44,715 $0 Not Implemented
SF0407 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $7,965 $672 Implemented
SF0407 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,152 $672 Implemented
SF0407 # 04 Y:2012 04 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $3,004 $0 Not Implemented
SF0407 # 05 Y:2012 05 2012 LOWER CEILING TO REDUCE CONDITIONED SPACE $1,231 $630 Not Implemented
SF0407 # 06 Y:2012 06 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $1,437 $1,299 Implemented
SF0407 # 07 Y:2012 07 2012 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $326 $312 Not Implemented
SF0407 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,040 $28,647 Not Implemented
OR0577 # 01 Y:2012 01 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $25,558 $7,571 Implemented
OR0577 # 02 Y:2012 02 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $2,191 $1,404 Implemented