Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,875
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0116 # 02 Y:2001 | 02 | 2001 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $18,236 | $114,000 | Not Implemented |
SU0116 # 03 Y:2001 | 03 | 2001 | INSULATE BARE EQUIPMENT | $7,323 | $979 | Implemented |
SU0116 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $5,330 | $16,000 | Not Implemented |
SU0116 # 05 Y:2001 | 05 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $418 | $100 | Implemented |
SU0116 # 06 Y:2001 | 06 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $329 | $0 | Not Implemented |
SU0116 # 07 Y:2001 | 07 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $503 | $0 | Implemented |
SU0115 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,222 | $0 | Implemented |
SU0115 # 02 Y:2001 | 02 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,645 | $225 | Implemented |
SU0115 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,834 | $0 | Not Implemented |
SU0115 # 04 Y:2001 | 04 | 2001 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $64,282 | $500,000 | Not Implemented |
SU0115 # 05 Y:2001 | 05 | 2001 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $81,279 | $750,000 | Not Implemented |
SU0115 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $80 | $0 | Implemented |
SU0115 # 07 Y:2001 | 07 | 2001 | INSTALL / REPAIR INSULATION ON STEAM LINES | $6,188 | $8,325 | Implemented |
SU0115 # 08 Y:2001 | 08 | 2001 | REPAIR AND ELIMINATE STEAM LEAKS | $14,780 | $9,400 | Implemented |
SU0102 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $48 | $0 | Implemented |
SU0102 # 02 Y:2001 | 02 | 2001 | DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS | $4,867 | $234 | Implemented |
SU0102 # 03 Y:2001 | 03 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $758 | $1,323 | Implemented |
SU0102 # 04 Y:2001 | 04 | 2001 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $231 | $250 | Not Implemented |
SU0102 # 05 Y:2001 | 05 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $30,000 | $34,762 | Not Implemented |
SU0102 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $189 | $244 | Not Implemented |
SU0102 # 07 Y:2001 | 07 | 2001 | MODIFY WORKLOAD | $147,739 | $201 | Not Implemented |
SU0101 # 01 Y:2001 | 01 | 2001 | RECYCLE CASTING SAND | $35,529 | $45,000 | Implemented |
SU0101 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $370 | $0 | Implemented |
SU0101 # 03 Y:2001 | 03 | 2001 | AIR CONDITION ONLY SPACE NECESSARY | $176 | $253 | Not Implemented |
SU0101 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,500 | $8,350 | Not Implemented |