Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0385 # 01 Y:1992 | 01 | 1992 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $265 | $280 | Implemented |
OK0385 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,839 | $608 | Implemented |
OK0385 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $705 | $2,000 | Implemented |
OK0385 # 04 Y:1992 | 04 | 1992 | REPAIR AND ELIMINATE STEAM LEAKS | $980 | $0 | Implemented |
OK0381 # 01 Y:1992 | 01 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $6,587 | $150 | Implemented |
OK0381 # 02 Y:1992 | 02 | 1992 | INSULATE BARE EQUIPMENT | $374 | $1,389 | Implemented |
OK0381 # 03 Y:1992 | 03 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,360 | $1,185 | Implemented |
OK0381 # 04 Y:1992 | 04 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,183 | $26,505 | Not Implemented |
OK0381 # 05 Y:1992 | 05 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,694 | $0 | Not Implemented |
OK0384 # 01 Y:1992 | 01 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,774 | $0 | Implemented |
OK0384 # 02 Y:1992 | 02 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,854 | $574 | Not Implemented |
OK0384 # 03 Y:1992 | 03 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $148,079 | $77,986 | Not Implemented |
OK0384 # 04 Y:1992 | 04 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,046 | $7,844 | Not Implemented |
OK0384 # 05 Y:1992 | 05 | 1992 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $3,416 | $9,000 | Not Implemented |
OK0384 # 06 Y:1992 | 06 | 1992 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,847 | $16,034 | Implemented |
OK0382 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $345 | $6,362 | Implemented |
OK0382 # 02 Y:1992 | 02 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $909 | $606 | Implemented |
OK0382 # 03 Y:1992 | 03 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,333 | $2,790 | Implemented |
OK0382 # 04 Y:1992 | 04 | 1992 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $12,447 | $29,926 | Implemented |
OK0382 # 05 Y:1992 | 05 | 1992 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $20,707 | $66,000 | Not Implemented |
OK0382 # 06 Y:1992 | 06 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $372 | $2,263 | Implemented |
OK0378 # 01 Y:1992 | 01 | 1992 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $11,528 | $700 | Not Implemented |
OK0378 # 02 Y:1992 | 02 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,435 | $3,500 | Implemented |
OK0378 # 03 Y:1992 | 03 | 1992 | HEAT WATER WITH EXHAUST HEAT | $8,382 | $270 | Implemented |
OK0378 # 04 Y:1992 | 04 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $5,156 | $3,125 | Not Implemented |