IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0686 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,650 $17,105 Not Implemented
GT0686 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $2,430 Implemented
GT0686 # 09 Y:2000 09 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,132 $49,180 Implemented
GT0686 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $944 Implemented
GT0686 # 11 Y:2000 11 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $540 $0 Not Implemented
GT0686 # 12 Y:2000 12 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,730 $0 Not Implemented
WV0190 # 01 Y:2000 01 2000 IMPROVE COMBUSTION CONTROL CAPABILITY $204,769 $34,000 Implemented
WV0190 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,748 $9,600 Not Implemented
WV0190 # 03 Y:2000 03 2000 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $24,565 $9,120 Not Implemented
WV0190 # 04 Y:2000 04 2000 COVER OPEN TANKS $11,730 $5,760 Implemented
WV0190 # 05 Y:2000 05 2000 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $920 $850 Not Implemented
WV0190 # 06 Y:2000 06 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,883 $780 Implemented
WV0190 # 07 Y:2000 07 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $63,174 $66,000 Implemented
WV0190 # 08 Y:2000 08 2000 INSTALL SPECTRAL REFLECTORS / DELAMP $2,768 $2,868 Not Implemented
WV0190 # 09 Y:2000 09 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,514 $30 Not Implemented
WV0190 # 10 Y:2000 10 2000 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $52,195 $13,550 Not Implemented
WV0190 # 11 Y:2000 11 2000 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $66,820 $78,000 Implemented
WV0190 # 12 Y:2000 12 2000 INSTALL SENSORS TO DETECT DEFECTS $1,785,600 $2,400,000 Not Implemented
WV0190 # 13 Y:2000 13 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $15,000 $6,240 Not Implemented
UM0161 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,365 $450 Implemented
UM0161 # 02 Y:2000 02 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,614 $500 Not Implemented
UM0161 # 03 Y:2000 03 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $48,437 $500 Implemented
UM0161 # 04 Y:2000 04 2000 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,098 $656 Not Implemented
UM0161 # 05 Y:2000 05 2000 UPGRADE OBSOLETE EQUIPMENT $5,016 $5,700 Not Implemented
TP0016 # 01 Y:2000 01 2000 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $8,751 $5,000 Implemented