IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0239 # 07 Y:1995 07 1995 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS $1,208 $0 Not Implemented
WI0239 # 08 Y:1995 08 1995 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $1,184 $1,000 Not Implemented
WI0239 # 09 Y:1995 09 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $960 Not Implemented
WI0239 # 10 Y:1995 10 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $265 $0 Not Implemented
WI0239 # 11 Y:1995 11 1995 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS $19,100 $20,000 Not Implemented
NC0053 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,554 $476 Not Implemented
NC0053 # 02 Y:1995 02 1995 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $161 $150 Implemented
NC0053 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $833 $2,100 Not Implemented
NC0053 # 04 Y:1995 04 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $495 $150 Implemented
NC0053 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,991 $3,790 Implemented
NC0053 # 06 Y:1995 06 1995 INSULATE BARE EQUIPMENT $1,717 $248 Implemented
IA0112 # 01 Y:1995 01 1995 SHUT OFF PILOTS IN STANDBY EQUIPMENT $38,404 $325 Implemented
IA0112 # 02 Y:1995 02 1995 COVER OPEN TANKS $12,802 $5,018 Not Implemented
IA0112 # 03 Y:1995 03 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $8,978 $50 Implemented
IA0112 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,062 $9,608 Implemented
IA0112 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,490 $951 Implemented
IA0112 # 06 Y:1995 06 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,463 $500 Implemented
IA0112 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,119 $325 Implemented
IA0112 # 08 Y:1995 08 1995 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,454 $3,000 Not Implemented
GT0553 # 01 Y:1995 01 1995 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $85,560 $85,000 Not Implemented
GT0553 # 02 Y:1995 02 1995 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $68,015 $0 Not Implemented
GT0553 # 03 Y:1995 03 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $22,120 $36,400 Not Implemented
GT0553 # 04 Y:1995 04 1995 ISOLATE HOT OR COLD EQUIPMENT $6,865 $2,560 Not Implemented
GT0553 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,018 $4,100 Not Implemented
GT0553 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,590 $7,720 Not Implemented