Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 1995 |
Principal Product | Printed Labels |
NAICS | n/a |
SIC | 2752 - Commercial Printing, Lithographic |
Sales | $5,000,000-$10,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 95,000 |
Annual Production | 385,000 Thousand Feet |
Production Hrs. Annual | 7,200 |
Location (State) | IL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $90,879 | 1,820,340 | kWh | $0.05 |
Natural Gas | $21,426 | 5,081 | MMBtu | $4.22 |
TOTAL ENERGY COSTS | $2,532,605 | |||
RECOMMENDED SAVINGS* | $36,993 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | MMBtu | $ | gal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $4,137 Cost: $18,000 |
$4,137 | 82,943 | - | - | - | - |
$4,137 82,943 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $3,043 Cost: $4,960 |
- | - | $3,043 | 653 | - | - |
- - kWh |
$3,043 653 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,418 Cost: $4,175 |
$2,418 | 48,359 | - | - | - | - |
$2,418 48,359 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,095 Cost: $675 |
$1,095 | 21,981 | - | - | - | - |
$1,095 21,981 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $2,299 Cost: $800 |
- | - | $2,299 | 545 | - | - |
- - kWh |
$2,299 545 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $1,934 Cost: - |
$1,934 | - | - | - | - | - |
$1,934 - kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS |
Savings: $1,208 Cost: - |
$1,208 | - | - | - | - | - |
$1,208 - kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR |
Savings: $1,184 Cost: $1,000 |
- | - | $1,184 | 281 | - | - |
- - kWh |
$1,184 281 MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $310 Cost: $960 |
$310 | 6,155 | - | - | - | - |
$310 6,155 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $265 Cost: - |
$265 | 5,275 | - | - | - | - |
$265 5,275 kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS |
Savings: $19,100 Cost: $20,000 |
- | - | - | - | $19,100 | 30,000 |
- - kWh |
- - MMBtu |
$19,100 30,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $36,993 Cost: $50,570 |
$11,367 | 164,713 | $6,526 | 1,479 | $19,100 | 30,000 | $11,367 164,713 kWh |
$6,526 1,479 MMBtu |
$19,100 30,000 gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - MMBtu |
- - gal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | MMBtu | $ | gal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Natural Gas | Other Liquid (non-haz) | Electricity Usage | Natural Gas | Other Liquid (non-haz) |