IAC logo
IAC Assessment: WI0239
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0239
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 1995
Principal Product Printed Labels
NAICS n/a
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 110
Plant Area (Sq.Ft.) 95,000
Annual Production 385,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) IL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $90,879 1,820,340 kWh $0.05
Natural Gas $21,426 5,081 MMBtu $4.22
TOTAL ENERGY COSTS $2,532,605
RECOMMENDED SAVINGS* $36,993 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Liquid (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz)
$ kWh $ MMBtu $ gal
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$4,137
Cost:
$18,000
$4,137 82,943 - - - - $4,137
82,943
kWh
-
-
MMBtu
-
-
gal
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$3,043
Cost:
$4,960
- - $3,043 653 - - -
-
kWh
$3,043
653
MMBtu
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,418
Cost:
$4,175
$2,418 48,359 - - - - $2,418
48,359
kWh
-
-
MMBtu
-
-
gal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,095
Cost:
$675
$1,095 21,981 - - - - $1,095
21,981
kWh
-
-
MMBtu
-
-
gal
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$2,299
Cost:
$800
- - $2,299 545 - - -
-
kWh
$2,299
545
MMBtu
-
-
gal
06: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,934
Cost:
-
$1,934 - - - - - $1,934
-
kWh
-
-
MMBtu
-
-
gal
07: 2.3135 SCHEDULE ROUTINE MAINTENANCE DURING NON-OPERATING PERIODS Savings:
$1,208
Cost:
-
$1,208 - - - - - $1,208
-
kWh
-
-
MMBtu
-
-
gal
08: 2.2492 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR Savings:
$1,184
Cost:
$1,000
- - $1,184 281 - - -
-
kWh
$1,184
281
MMBtu
-
-
gal
09: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$310
Cost:
$960
$310 6,155 - - - - $310
6,155
kWh
-
-
MMBtu
-
-
gal
10: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$265
Cost:
-
$265 5,275 - - - - $265
5,275
kWh
-
-
MMBtu
-
-
gal
11: 3.3125 USE DISTILLATION, EVAPORATION TO REMOVE CONTAMINANTS Savings:
$19,100
Cost:
$20,000
- - - - $19,100 30,000 -
-
kWh
-
-
MMBtu
$19,100
30,000
gal
TOTAL RECOMMENDED Savings:
$36,993
Cost:
$50,570
$11,367 164,713 $6,526 1,479 $19,100 30,000 $11,367
164,713
kWh
$6,526
1,479
MMBtu
$19,100
30,000
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ MMBtu $ gal
Electricity Usage Natural Gas Other Liquid (non-haz) Electricity Usage Natural Gas Other Liquid (non-haz)