IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IA0380 # 06 Y:2006 06 2006 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $11,632 $4,000 Not Implemented
IA0380 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN WATER LINES AND VALVES $298 $650 Not Implemented
IA0380 # 08 Y:2006 08 2006 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $35,020 $29,000 Not Implemented
LM0109 # 01 Y:2006 01 2006 USE POWER DURING OFF-PEAK PERIODS $65,901 $200,000 Implemented
LM0109 # 02 Y:2006 02 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $408 $586 Implemented
LM0109 # 03 Y:2006 03 2006 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $13,210 $90,000 Implemented
LM0109 # 04 Y:2006 04 2006 AUTOMATE FINISHING PROCESS $240,621 $225,000 Not Implemented
LM0109 # 05 Y:2006 05 2006 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $220,603 $170,000 Not Implemented
LM0109 # 06 Y:2006 06 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $14,573 $120,000 Implemented
LM0109 # 07 Y:2006 07 2006 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $8,917 $7,000 Implemented
SF0320 # 01 Y:2006 01 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $528 $488 Implemented
SF0320 # 02 Y:2006 02 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,706 $5,690 Not Implemented
SF0320 # 03 Y:2006 03 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,797 $2,531 Implemented
SF0320 # 04 Y:2006 04 2006 INSTALL OCCUPANCY SENSORS $880 $1,320 Not Implemented
SF0320 # 05 Y:2006 05 2006 OPTIMIZE PLANT POWER FACTOR $1,799 $3,725 Not Implemented
SF0320 # 06 Y:2006 06 2006 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,670 $30,700 Not Implemented
MA0592 # 01 Y:2006 01 2006 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $74,191 $368,500 Not Implemented
MA0592 # 02 Y:2006 02 2006 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $56,494 $73,748 Implemented
MA0592 # 03 Y:2006 03 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $33,861 $138,775 Not Implemented
MA0592 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,789 $0 Implemented
MA0592 # 05 Y:2006 05 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,338 $3,295 Implemented
MI0121 # 01 Y:2006 01 2006 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,669 $0 Implemented
MI0121 # 02 Y:2006 02 2006 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $3,836 $122 Not Implemented
MI0121 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $2,209 $420 Implemented
MI0121 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,015 $964 Implemented