Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,754
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK0372 # 04 Y:1992 | 04 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,558 | $9,275 | Not Implemented |
OK0370 # 01 Y:1992 | 01 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $463 | $2,810 | Implemented |
OK0370 # 02 Y:1992 | 02 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,226 | $70 | Implemented |
OK0370 # 03 Y:1992 | 03 | 1992 | INSTALL TIMERS AND/OR THERMOSTATS | $3,047 | $1,000 | Implemented |
OK0370 # 04 Y:1992 | 04 | 1992 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,461 | $405 | Implemented |
OK0370 # 05 Y:1992 | 05 | 1992 | OPTIMIZE PLANT POWER FACTOR | $942 | $1,125 | Not Implemented |
OK0371 # 01 Y:1992 | 01 | 1992 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,816 | $0 | Implemented |
OK0371 # 02 Y:1992 | 02 | 1992 | INSULATE FEEDWATER TANK | $253 | $150 | Implemented |
OK0371 # 03 Y:1992 | 03 | 1992 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $267 | $69 | Implemented |
OK0371 # 04 Y:1992 | 04 | 1992 | INSTALL / REPAIR INSULATION ON STEAM LINES | $220 | $185 | Implemented |
OK0371 # 05 Y:1992 | 05 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,767 | $2,434 | Not Implemented |
OK0371 # 06 Y:1992 | 06 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $730 | $138 | Implemented |
OK0371 # 07 Y:1992 | 07 | 1992 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $17,621 | $23,222 | Not Implemented |
OK0369 # 01 Y:1992 | 01 | 1992 | OPTIMIZE PLANT POWER FACTOR | $1,250 | $990 | Implemented |
OK0369 # 02 Y:1992 | 02 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,302 | $7,440 | Not Implemented |
OK0369 # 03 Y:1992 | 03 | 1992 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,038 | $0 | Implemented |
OK0369 # 04 Y:1992 | 04 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $946 | $0 | Implemented |
OK0365 # 01 Y:1992 | 01 | 1992 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $118 | $0 | Not Implemented |
OK0365 # 02 Y:1992 | 02 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $249 | $119 | Not Implemented |
OK0365 # 03 Y:1992 | 03 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $466 | $0 | Implemented |
OK0365 # 04 Y:1992 | 04 | 1992 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $172 | $382 | Implemented |
OK0365 # 05 Y:1992 | 05 | 1992 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $128 | $0 | Implemented |
OK0365 # 06 Y:1992 | 06 | 1992 | MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE | $2,802 | $9,800 | Implemented |
OK0365 # 07 Y:1992 | 07 | 1992 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $100 | $120 | Implemented |
OK0367 # 01 Y:1992 | 01 | 1992 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $37,088 | $0 | Implemented |