IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0131 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $238 $0 Not Implemented
LE0131 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,937 $6,200 Not Implemented
WV0236 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,180 $4,900 Implemented
WV0236 # 02 Y:2002 02 2002 UTILIZE A LESS EXPENSIVE COOLING METHOD $826 $585 Implemented
WV0236 # 03 Y:2002 03 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $29,035 $44,954 Not Implemented
WV0236 # 04 Y:2002 04 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,403 $124 Not Implemented
WV0236 # 05 Y:2002 05 2002 RECOVER WASTE HEAT FROM EQUIPMENT $37,820 $422 Implemented
WV0236 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,340 $84 Implemented
WV0236 # 07 Y:2002 07 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $1,206 $3,600 Implemented
WV0236 # 08 Y:2002 08 2002 INSTALL OCCUPANCY SENSORS $1,272 $750 Implemented
WV0236 # 09 Y:2002 09 2002 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $12,994 $560 Implemented
WV0236 # 10 Y:2002 10 2002 RECOVER WASTE HEAT FROM EQUIPMENT $8,237 $2,163 Not Implemented
WV0236 # 11 Y:2002 11 2002 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $5,850 $1,537 Not Implemented
WV0236 # 12 Y:2002 12 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $21,840 $13,000 Not Implemented
WV0236 # 13 Y:2002 13 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $14,000 $6,000 Not Implemented
LE0130 # 01 Y:2002 01 2002 INSTALL OCCUPANCY SENSORS $5,934 $150 Not Implemented
LE0130 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $583 $180 Not Implemented
LE0130 # 03 Y:2002 03 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,040 $0 Implemented
LE0130 # 04 Y:2002 04 2002 IMPROVE COMBUSTION CONTROL CAPABILITY $8,789 $1,000 Implemented
LE0130 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,677 $0 Implemented
LE0130 # 06 Y:2002 06 2002 IMPROVE LUBRICATION PRACTICES $7,373 $400 Not Implemented
LE0130 # 07 Y:2002 07 2002 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $105,753 $60,000 Not Implemented
WV0231 # 01 Y:2002 01 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,654 $900 Implemented
WV0231 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $1,600 $156 Implemented
WV0231 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $130 $384 Not Implemented