IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,333

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ND0347 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $125 $100 Implemented
ND0347 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,121 $6,762 Not Implemented
ND0347 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $13,997 $11,000 Implemented
ND0347 # 04 Y:2000 04 2000 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $115 $0 Implemented
ND0347 # 05 Y:2000 05 2000 DEVELOP A REPAIR/REPLACE POLICY $360 $843 Not Implemented
ND0347 # 06 Y:2000 06 2000 USE OPTIMUM TEMPERATURE $10 $8 Implemented
ND0347 # 07 Y:2000 07 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $236 $900 Implemented
ND0347 # 08 Y:2000 08 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $79 $340 Not Implemented
WV0186 # 01 Y:2000 01 2000 INSULATE BARE EQUIPMENT $730 $472 Implemented
WV0186 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $5,510 $0 Implemented
WV0186 # 03 Y:2000 03 2000 INSULATE BARE EQUIPMENT $100 $138 Implemented
WV0186 # 04 Y:2000 04 2000 ISOLATE HOT OR COLD EQUIPMENT $655 $1,580 Not Implemented
WV0186 # 05 Y:2000 05 2000 RECOVER WASTE HEAT FROM EQUIPMENT $200 $470 Not Implemented
WV0186 # 06 Y:2000 06 2000 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,834 $1,000 Not Implemented
WV0186 # 07 Y:2000 07 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $385 $45 Implemented
WV0186 # 08 Y:2000 08 2000 RECOVER WASTE HEAT FROM EQUIPMENT $47,250 $400,000 Not Implemented
WV0186 # 09 Y:2000 09 2000 METER WASTE WATER $25,656 $0 Implemented
WV0186 # 10 Y:2000 10 2000 RECOVER AND REUSE WASTE MATERIAL $5,755 $5,000 Not Implemented
WV0186 # 11 Y:2000 11 2000 PAY BILLS ON TIME TO AVOID LATE FEES $371 $0 Implemented
MA0464 # 01 Y:2000 01 2000 REPLACE PURCHASED STEAM WITH OTHER ENERGY SOURCE $15,077 $36,000 Not Implemented
MA0464 # 02 Y:2000 02 2000 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $193 $0 Implemented
MA0464 # 03 Y:2000 03 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $440 Implemented
ME0289 # 01 Y:2000 01 2000 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $66,856 $175,000 Not Implemented
ME0289 # 02 Y:2000 02 2000 INSTALL / REPAIR INSULATION ON STEAM LINES $3,387 $3,165 Implemented
ME0289 # 03 Y:2000 03 2000 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $3,100 $6,600 Not Implemented