IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0029 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $10,646 $900 Implemented
IC0029 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,828 $3,000 Implemented
IC0029 # 05 Y:2002 05 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,179 $1,500 Implemented
IC0029 # 06 Y:2002 06 2002 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $36,712 $36,036 Implemented
IC0029 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $1,616 $906 Implemented
IC0029 # 08 Y:2002 08 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $18,000 $3,280 Not Implemented
IC0029 # 09 Y:2002 09 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,753 $49,560 Not Implemented
IC0029 # 10 Y:2002 10 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,519 $20,549 Not Implemented
IC0029 # 11 Y:2002 11 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,182 $4,751 Not Implemented
IC0029 # 12 Y:2002 12 2002 INSTALL OCCUPANCY SENSORS $962 $2,112 Not Implemented
IC0029 # 13 Y:2002 13 2002 MODIFY WORKLOAD $150,000 $32,000 Not Implemented
IC0029 # 14 Y:2002 14 2002 ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL $102,000 $8,500 Not Implemented
MI0027 # 01 Y:2002 01 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,448 $1,859 Implemented
MI0027 # 02 Y:2002 02 2002 INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS $1,410 $2,000 Not Implemented
MI0027 # 03 Y:2002 03 2002 MODIFY STARTUP/SHUTDOWN TIMES $150,000 $3,900 Implemented
MI0027 # 04 Y:2002 04 2002 RECYCLE WHITE WATER $2,639 $982 Not Implemented
MI0027 # 05 Y:2002 05 2002 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,727 $1,250 Not Implemented
GT0727 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $563,200 $1,563,200 Not Implemented
GT0727 # 02 Y:2002 02 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,807,000 $0 Implemented
GT0727 # 03 Y:2002 03 2002 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $1,527,000 $4,140,000 Not Implemented
GT0727 # 04 Y:2002 04 2002 REDESIGN PROCESS $2,159,550 $0 Implemented
GT0727 # 05 Y:2002 05 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $165,202 $0 Not Implemented
GT0727 # 06 Y:2002 06 2002 REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT $679,000 $250,000 Not Implemented
GT0727 # 07 Y:2002 07 2002 INSULATE BARE EQUIPMENT $147,500 $181,000 Not Implemented
GT0727 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,468 $321,854 Implemented