Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0029 # 03 Y:2002 | 03 | 2002 | REPAIR AND ELIMINATE STEAM LEAKS | $10,646 | $900 | Implemented |
IC0029 # 04 Y:2002 | 04 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,828 | $3,000 | Implemented |
IC0029 # 05 Y:2002 | 05 | 2002 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,179 | $1,500 | Implemented |
IC0029 # 06 Y:2002 | 06 | 2002 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $36,712 | $36,036 | Implemented |
IC0029 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $1,616 | $906 | Implemented |
IC0029 # 08 Y:2002 | 08 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $18,000 | $3,280 | Not Implemented |
IC0029 # 09 Y:2002 | 09 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,753 | $49,560 | Not Implemented |
IC0029 # 10 Y:2002 | 10 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,519 | $20,549 | Not Implemented |
IC0029 # 11 Y:2002 | 11 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,182 | $4,751 | Not Implemented |
IC0029 # 12 Y:2002 | 12 | 2002 | INSTALL OCCUPANCY SENSORS | $962 | $2,112 | Not Implemented |
IC0029 # 13 Y:2002 | 13 | 2002 | MODIFY WORKLOAD | $150,000 | $32,000 | Not Implemented |
IC0029 # 14 Y:2002 | 14 | 2002 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $102,000 | $8,500 | Not Implemented |
MI0027 # 01 Y:2002 | 01 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,448 | $1,859 | Implemented |
MI0027 # 02 Y:2002 | 02 | 2002 | INSTALL OR UPGRADE INSULATION ON HVAC DISTRIBUTION SYSTEMS | $1,410 | $2,000 | Not Implemented |
MI0027 # 03 Y:2002 | 03 | 2002 | MODIFY STARTUP/SHUTDOWN TIMES | $150,000 | $3,900 | Implemented |
MI0027 # 04 Y:2002 | 04 | 2002 | RECYCLE WHITE WATER | $2,639 | $982 | Not Implemented |
MI0027 # 05 Y:2002 | 05 | 2002 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,727 | $1,250 | Not Implemented |
GT0727 # 01 Y:2002 | 01 | 2002 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $563,200 | $1,563,200 | Not Implemented |
GT0727 # 02 Y:2002 | 02 | 2002 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $1,807,000 | $0 | Implemented |
GT0727 # 03 Y:2002 | 03 | 2002 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $1,527,000 | $4,140,000 | Not Implemented |
GT0727 # 04 Y:2002 | 04 | 2002 | REDESIGN PROCESS | $2,159,550 | $0 | Implemented |
GT0727 # 05 Y:2002 | 05 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $165,202 | $0 | Not Implemented |
GT0727 # 06 Y:2002 | 06 | 2002 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $679,000 | $250,000 | Not Implemented |
GT0727 # 07 Y:2002 | 07 | 2002 | INSULATE BARE EQUIPMENT | $147,500 | $181,000 | Not Implemented |
GT0727 # 08 Y:2002 | 08 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,468 | $321,854 | Implemented |