Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,723
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MI0128 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $78,238 | $4,445 | Not Implemented |
MI0128 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $19,974 | $5,000 | Not Implemented |
MI0128 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,372 | $31,540 | Implemented |
MI0128 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,248 | $1,750 | Not Implemented |
MI0128 # 05 Y:2006 | 05 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,703 | $1,074 | Implemented |
MI0128 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $6,762 | $4,800 | Not Implemented |
MI0128 # 07 Y:2006 | 07 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,984 | $30 | Implemented |
MI0127 # 01 Y:2006 | 01 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $34,584 | $3,984 | Not Implemented |
MI0127 # 02 Y:2006 | 02 | 2006 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $25,742 | $46,506 | Not Implemented |
MI0127 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,532 | $33,405 | Implemented |
MI0127 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,597 | $1,074 | Implemented |
MI0127 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $9,247 | $30 | Not Implemented |
MI0127 # 06 Y:2006 | 06 | 2006 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $9,084 | $4,800 | Implemented |
MI0127 # 07 Y:2006 | 07 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,640 | $0 | Not Implemented |
MI0127 # 08 Y:2006 | 08 | 2006 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $2,107 | $3,878 | Implemented |
MI0126 # 01 Y:2006 | 01 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,617 | $16,000 | Implemented |
MI0126 # 02 Y:2006 | 02 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $8,323 | $1,020 | Implemented |
MI0126 # 03 Y:2006 | 03 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,331 | $212 | Implemented |
MI0126 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,497 | $1,750 | Implemented |
MI0126 # 05 Y:2006 | 05 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,474 | $0 | Implemented |
MI0126 # 06 Y:2006 | 06 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,242 | $140 | Implemented |
MI0125 # 01 Y:2006 | 01 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $61,073 | $1,290 | Implemented |
MI0125 # 02 Y:2006 | 02 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $28,374 | $75,894 | Not Implemented |
MI0125 # 03 Y:2006 | 03 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $32,634 | $35,000 | Implemented |
MI0125 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $24,438 | $1,074 | Implemented |