Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,644
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0223 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,270 | $124 | Implemented |
WV0223 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,630 | $386 | Not Implemented |
WV0223 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,635 | $1,344 | Implemented |
WV0223 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,567 | $44 | Implemented |
WV0223 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,680 | $220 | Implemented |
WV0223 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $92,576 | $12,000 | Not Implemented |
WV0223 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $216,000 | $400,000 | Not Implemented |
WV0222 # 01 Y:2001 | 01 | 2001 | USE COOLING AIR WHICH COOLS HOT WORK PIECES FOR SPACE HEATING | $16,581 | $2,904 | Not Implemented |
WV0222 # 02 Y:2001 | 02 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $935 | $100 | Implemented |
WV0222 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $6,296 | $1,000 | Implemented |
WV0222 # 04 Y:2001 | 04 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,685 | $880 | Implemented |
WV0222 # 05 Y:2001 | 05 | 2001 | INSTALL SPECTRAL REFLECTORS / DELAMP | $1,036 | $1,025 | Not Implemented |
WV0222 # 06 Y:2001 | 06 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $13,220 | $1,792 | Implemented |
WV0222 # 07 Y:2001 | 07 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,470 | $208 | Not Implemented |
WV0222 # 08 Y:2001 | 08 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,491 | $44 | Implemented |
WV0222 # 09 Y:2001 | 09 | 2001 | BURN WASTE OIL FOR HEAT | $2,857 | $3,172 | Not Implemented |
WV0222 # 10 Y:2001 | 10 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $1,376 | $1,528 | Not Implemented |
WV0222 # 11 Y:2001 | 11 | 2001 | RECYCLE FLUORESCENT LAMPS | $3,390 | $352 | Implemented |
WV0222 # 12 Y:2001 | 12 | 2001 | $45,760 | $5,000 | Implemented | |
WV0222 # 13 Y:2001 | 13 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $15,000 | $332 | Implemented |
LE0118 # 01 Y:2001 | 01 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,581 | $2,500 | Not Implemented |
LE0118 # 02 Y:2001 | 02 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,252 | $0 | Not Implemented |
LE0118 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $769 | $135 | Implemented |
LE0118 # 04 Y:2001 | 04 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $480 | $0 | Implemented |
LE0118 # 05 Y:2001 | 05 | 2001 | ISOLATE HOT OR COLD EQUIPMENT | $339 | $1,615 | Not Implemented |