IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0129 # 01 Y:2002 01 2002 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $191,600 $22,000 Implemented
LL0129 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $182,915 $7,125 Not Implemented
LL0129 # 03 Y:2002 03 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $145,921 $7,125 Not Implemented
LL0129 # 04 Y:2002 04 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $134,101 $7,125 Not Implemented
LL0129 # 05 Y:2002 05 2002 OPTIMIZE PLANT POWER FACTOR $121,713 $95,025 Implemented
LL0129 # 06 Y:2002 06 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $29,381 $28,907 Implemented
LL0129 # 07 Y:2002 07 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $52,853 $12,720 Implemented
LL0129 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,741 $7,200 Implemented
LL0129 # 09 Y:2002 09 2002 USE PHOTOCELL CONTROLS $2,065 $702 Not Implemented
AS0319 # 01 Y:2002 01 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,602 $3,885 Not Implemented
AS0319 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $110 $525 Not Implemented
AS0319 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,641 $7,690 Implemented
AS0319 # 04 Y:2002 04 2002 CONTRACT A WOOD PALLET RECYCLING COMPANY $288 $117 Not Implemented
SU0130 # 01 Y:2002 01 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $217 $518 Implemented
SU0130 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $307 $38 Implemented
SU0130 # 03 Y:2002 03 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $442 $871 Not Implemented
SU0130 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,614 $1,875 Not Implemented
SU0130 # 05 Y:2002 05 2002 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $33,055 $2,330 Not Implemented
SU0130 # 06 Y:2002 06 2002 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $109,460 $1,150,000 Not Implemented
WI0414 # 01 Y:2002 01 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $13,469 $1,800 Not Implemented
WI0414 # 02 Y:2002 02 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $6,619 $14,000 Not Implemented
WI0414 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,225 $0 Implemented
WI0414 # 04 Y:2002 04 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $4,730 $0 Implemented
WI0414 # 05 Y:2002 05 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,560 $1,033 Not Implemented
WI0414 # 06 Y:2002 06 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,971 $0 Not Implemented