Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Wisconsin, Milwaukee |
---|---|
Assessment Year | 2002 |
Principal Product | Hinges & Tubler Parts |
NAICS | n/a |
SIC | 3452 - Bolts, Nuts, Rivets, And Washers |
Sales | $10,000,000-$50,000,000 |
# of Employees | 128 |
Plant Area (Sq.Ft.) | 102,000 |
Annual Production | 2,147,483,647 Pieces |
Production Hrs. Annual | 4,375 |
Location (State) | WI |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $136,077 | 2,215,714 | kWh | $0.06 |
Electricity Demand | $52,466 | 5,058 | kW-months/year | $10.37 |
Electricity Fees | $4,633 | - | $ | - |
Natural Gas | $78,524 | 9,549 | MMBtu | $8.22 |
TOTAL ENERGY COSTS | $285,438 | |||
RECOMMENDED SAVINGS* | $35,399 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $10,780 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS |
Savings: $13,469 Cost: $1,800 |
- | - | - | - | $13,469 | 1,639 | - | - |
- - kWh |
- - kW-months/year |
$13,469 1,639 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER |
Savings: $6,619 Cost: $14,000 |
$(-1,103) | (-16,319) | - | - | - | - | $7,722 | - |
$(-1,103) (-16,319) kWh |
- - kW-months/year |
- - MMBtu |
$7,722 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $4,225 Cost: - |
$2,386 | 63,462 | $1,839 | 168 | - | - | - | - |
$2,386 63,462 kWh |
$1,839 168 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS |
Savings: $4,730 Cost: - |
$201 | 5,359 | - | - | $4,529 | 551 | - | - |
$201 5,359 kWh |
- - kW-months/year |
$4,529 551 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,560 Cost: $1,033 |
- | - | - | - | $2,560 | 312 | - | - |
- - kWh |
- - kW-months/year |
$2,560 312 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $1,971 Cost: - |
- | - | $1,971 | 180 | - | - | - | - |
- - kWh |
$1,971 180 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $1,071 Cost: $2,400 |
$523 | 13,897 | $548 | 50 | - | - | - | - |
$523 13,897 kWh |
$548 50 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $754 Cost: $350 |
$510 | 13,563 | $244 | 22 | - | - | - | - |
$510 13,563 kWh |
$244 22 kW-months/year |
- - MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $35,399 Cost: $19,583 |
$2,517 | 79,962 | $4,602 | 420 | $20,558 | 2,502 | $7,722 | - | $2,517 79,962 kWh |
$4,602 420 kW-months/year |
$20,558 2,502 MMBtu |
$7,722 - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $10,780 Cost: $2,750 |
$3,620 | 96,281 | $2,631 | 240 | $4,529 | 551 | - | - | $3,620 96,281 kWh |
$2,631 240 kW-months/year |
$4,529 551 MMBtu |
- - Tgal |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Consumption | Electricity Usage | Electricity Demand | Natural Gas | Water Consumption |