IAC logo
IAC Assessment: WI0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: WI0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Wisconsin, Milwaukee
Assessment Year 2002
Principal Product Hinges & Tubler Parts
NAICS n/a
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 128
Plant Area (Sq.Ft.) 102,000
Annual Production 2,147,483,647 Pieces
Production Hrs. Annual 4,375
Location (State) WI
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $136,077 2,215,714 kWh $0.06
Electricity Demand $52,466 5,058 kW-months/year $10.37
Electricity Fees $4,633 - $ -
Natural Gas $78,524 9,549 MMBtu $8.22
TOTAL ENERGY COSTS $285,438
RECOMMENDED SAVINGS* $35,399 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,780
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$13,469
Cost:
$1,800
- - - - $13,469 1,639 - - -
-
kWh
-
-
kW-months/year
$13,469
1,639
MMBtu
-
-
Tgal
02: 3.4114 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER Savings:
$6,619
Cost:
$14,000
$(-1,103) (-16,319) - - - - $7,722 - $(-1,103)
(-16,319)
kWh
-
-
kW-months/year
-
-
MMBtu
$7,722
-
Tgal
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,225
Cost:
-
$2,386 63,462 $1,839 168 - - - - $2,386
63,462
kWh
$1,839
168
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$4,730
Cost:
-
$201 5,359 - - $4,529 551 - - $201
5,359
kWh
-
-
kW-months/year
$4,529
551
MMBtu
-
-
Tgal
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,560
Cost:
$1,033
- - - - $2,560 312 - - -
-
kWh
-
-
kW-months/year
$2,560
312
MMBtu
-
-
Tgal
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$1,971
Cost:
-
- - $1,971 180 - - - - -
-
kWh
$1,971
180
kW-months/year
-
-
MMBtu
-
-
Tgal
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,071
Cost:
$2,400
$523 13,897 $548 50 - - - - $523
13,897
kWh
$548
50
kW-months/year
-
-
MMBtu
-
-
Tgal
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$754
Cost:
$350
$510 13,563 $244 22 - - - - $510
13,563
kWh
$244
22
kW-months/year
-
-
MMBtu
-
-
Tgal
TOTAL RECOMMENDED Savings:
$35,399
Cost:
$19,583
$2,517 79,962 $4,602 420 $20,558 2,502 $7,722 - $2,517
79,962
kWh
$4,602
420
kW-months/year
$20,558
2,502
MMBtu
$7,722
-
Tgal
TOTAL IMPLEMENTED Savings:
$10,780
Cost:
$2,750
$3,620 96,281 $2,631 240 $4,529 551 - - $3,620
96,281
kWh
$2,631
240
kW-months/year
$4,529
551
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Consumption Electricity Usage Electricity Demand Natural Gas Water Consumption