IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0476 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $435 $100 Implemented
NC0476 # 03 Y:2013 03 2013 RECOVER WASTE HEAT FROM EQUIPMENT $1,322 $2,500 Not Implemented
NC0476 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $9,719 $3,000 Implemented
NC0476 # 05 Y:2013 05 2013 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $5,556 $7,000 Not Implemented
NC0476 # 06 Y:2013 06 2013 ELIMINATE SHIFT $688,031 $25,000 Implemented
AM0629 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,508 $2,000 Not Implemented
AM0629 # 02 Y:2013 02 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $19,662 $0 Not Implemented
AM0629 # 03 Y:2013 03 2013 INSTALL OCCUPANCY SENSORS $11,600 $2,040 Not Implemented
AM0629 # 04 Y:2013 04 2013 USE PHOTOCELL CONTROLS $9,077 $1,574 Not Implemented
AM0629 # 05 Y:2013 05 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,548 $300 Not Implemented
AM0629 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,176 $879 Not Implemented
AM0629 # 07 Y:2013 07 2013 INSTALL OCCUPANCY SENSORS $558 $227 Not Implemented
AM0629 # 08 Y:2013 08 2013 USE SYNTHETIC LUBRICANT $420 $0 Not Implemented
SD0460 # 01 Y:2013 01 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $50,132 $152,300 Implemented
SD0460 # 02 Y:2013 02 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $48,502 $119,500 Not Implemented
SD0460 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $11,357 $1,000 Implemented
SD0460 # 04 Y:2013 04 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,875 $900 Implemented
SD0460 # 05 Y:2013 05 2013 REPLACE BOILER $4,735 $14,250 Not Implemented
SD0460 # 06 Y:2013 06 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,847 $7,050 Not Implemented
SD0460 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,515 $3,212 Implemented
SD0460 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,570 $200 Implemented
SD0460 # 09 Y:2013 09 2013 USE PHOTOCELL CONTROLS $1,249 $1,100 Not Implemented
SD0460 # 10 Y:2013 10 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $731 $2,500 Implemented
WV0460 # 01 Y:2013 01 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $17,183 $0 Implemented
WV0460 # 02 Y:2013 02 2013 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $14,224 $1,000 Implemented