IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,032

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0031 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,083 $3,000 Not Implemented
KU0031 # 04 Y:1982 04 1982 INSTALL / REPAIR INSULATION ON STEAM LINES $3,474 $1,010 Not Implemented
KU0031 # 05 Y:1982 05 1982 REPAIR AND ELIMINATE STEAM LEAKS $10,740 $750 Not Implemented
KU0032 # 01 Y:1982 01 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $14,570 $0 Not Implemented
KU0032 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,434 $0 Not Implemented
KU0032 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $3,756 $475 Not Implemented
KU0032 # 04 Y:1982 04 1982 INSTALL STORM WINDOWS AND DOORS $1,984 $568 Not Implemented
KU0032 # 05 Y:1982 05 1982 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $28,113 $40,000 Not Implemented
KU0033 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,443 $3,935 Implemented
KU0033 # 02 Y:1982 02 1982 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $1,573 $0 Implemented
KU0033 # 03 Y:1982 03 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $509 $700 Implemented
KU0033 # 04 Y:1982 04 1982 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $69 $0 Implemented
KU0024 # 01 Y:1981 01 1981 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $1,669 $2,600 Not Implemented
KU0024 # 02 Y:1981 02 1981 INSTALL TIMERS AND/OR THERMOSTATS $556 $0 Not Implemented
KU0024 # 03 Y:1981 03 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $349 $357 Not Implemented
KU0025 # 01 Y:1981 01 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $169 $100 Implemented
KU0025 # 02 Y:1981 02 1981 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $1,267 $1,200 Not Implemented
KU0025 # 03 Y:1981 03 1981 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $992 $0 Not Implemented
KU0025 # 04 Y:1981 04 1981 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $685 $2,076 Not Implemented
KU0025 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,689 $3,748 Implemented
KU0026 # 01 Y:1981 01 1981 OPTIMIZE PLANT POWER FACTOR $6,100 $8,200 Not Implemented
KU0026 # 02 Y:1981 02 1981 INSTALL SET-BACK TIMERS $15,466 $16,824 Not Implemented
KU0026 # 03 Y:1981 03 1981 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $370 $500 Not Implemented
KU0026 # 04 Y:1981 04 1981 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,128 $0 Not Implemented
KU0026 # 05 Y:1981 05 1981 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $238 $100 Not Implemented