Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,215
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UA0133 # 07 Y:2015 | 07 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,421 | $50 | Implemented |
UA0133 # 08 Y:2015 | 08 | 2015 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $2,428 | $0 | Not Implemented |
UA0133 # 09 Y:2015 | 09 | 2015 | INSTALL TIMERS AND/OR THERMOSTATS | $2,180 | $0 | Implemented |
UA0133 # 10 Y:2015 | 10 | 2015 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $1,848 | $2,636 | Implemented |
OR0643 # 01 Y:2015 | 01 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $5,697 | $0 | Implemented |
OR0643 # 02 Y:2015 | 02 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $24,403 | $46,360 | Implemented |
OR0643 # 03 Y:2015 | 03 | 2015 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $216,797 | $596,000 | Not Implemented |
MZ0166 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,360 | $6,500 | Implemented |
MZ0166 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $119 | $180 | Implemented |
MZ0166 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $675 | $900 | Implemented |
MZ0166 # 04 Y:2015 | 04 | 2015 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $617 | $100 | Implemented |
MZ0166 # 05 Y:2015 | 05 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,014 | $1,160 | Implemented |
MZ0166 # 06 Y:2015 | 06 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,376 | $0 | Not Implemented |
MZ0166 # 07 Y:2015 | 07 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,419 | $5,868 | Implemented |
MZ0166 # 08 Y:2015 | 08 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $308 | $0 | Implemented |
MZ0166 # 09 Y:2015 | 09 | 2015 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $3,328 | $5,600 | Implemented |
WV0497 # 01 Y:2015 | 01 | 2015 | UPGRADE CONTROLS ON COMPRESSORS | $27,086 | $24,525 | Not Implemented |
WV0497 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $20,552 | $4,210 | Not Implemented |
WV0497 # 03 Y:2015 | 03 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $9,773 | $3,008 | Implemented |
WV0497 # 04 Y:2015 | 04 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,054 | $4,016 | Implemented |
WV0497 # 05 Y:2015 | 05 | 2015 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,086 | $1,000 | Implemented |
WV0497 # 06 Y:2015 | 06 | 2015 | DEVELOP A REPAIR/REPLACE POLICY | $2,304 | $567 | Implemented |
WV0497 # 07 Y:2015 | 07 | 2015 | INSTALL SET-BACK TIMERS | $2,208 | $918 | Not Implemented |
WV0497 # 08 Y:2015 | 08 | 2015 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,824 | $404 | Not Implemented |
WV0497 # 09 Y:2015 | 09 | 2015 | INSTALL OCCUPANCY SENSORS | $1,207 | $186 | Not Implemented |