IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

469

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SJ0001 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,201 $0 Not Implemented
SJ0001 # 03 Y:2023 03 2023 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,541 $0 Not Implemented
SJ0001 # 04 Y:2023 04 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $480 $0 Not Implemented
SJ0001 # 05 Y:2023 05 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,785 $1,200 Not Implemented
SD0630 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,064 $7,542 Implemented
SD0630 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $664 $1,500 Implemented
SD0630 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $500 Implemented
SD0630 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,850 $9,294 Implemented
SD0630 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,049 $13,269 Implemented
SD0630 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $15,881 $57,222 Implemented
SD0630 # 07 Y:2023 07 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,113 $3,606 Implemented
SD0630 # 08 Y:2023 08 2023 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $5,832 $1,080 Implemented
SF0597 # 01 Y:2023 01 2023 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,268 $0 n/a
SF0597 # 02 Y:2023 02 2023 ADD AREA LIGHTING SWITCHES $11,388 $100 n/a
SF0597 # 03 Y:2023 03 2023 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $53,882 $13,192 n/a
SF0597 # 04 Y:2023 04 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $706 $200 n/a
SF0597 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $322,164 $2,251,041 n/a
SD0629 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $974 $1,320 Not Implemented
SD0629 # 02 Y:2023 02 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $64,030 $201,231 Not Implemented
SD0629 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,538 $10,551 Not Implemented
SD0629 # 04 Y:2023 04 2023 USE PHOTOCELL CONTROLS $888 $1,680 Not Implemented
SD0629 # 05 Y:2023 05 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,948 $100 Not Implemented
SD0628 # 01 Y:2023 01 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $67,963 $332,640 Not Implemented
SD0628 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $750 $1,100 Not Implemented
SD0628 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,372 $4,320 Not Implemented