Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,682
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0242 # 02 Y:2020 | 02 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,255 | $10,230 | Not Implemented |
IC0242 # 03 Y:2020 | 03 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,050 | $2,715 | Not Implemented |
IC0242 # 04 Y:2020 | 04 | 2020 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,839 | $0 | Not Implemented |
IC0242 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,675 | $4,640 | Not Implemented |
IC0242 # 06 Y:2020 | 06 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $9,655 | $0 | Not Implemented |
IC0241 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,437 | $2,557 | Implemented |
IC0241 # 02 Y:2020 | 02 | 2020 | BURN WOOD BY-PRODUCTS FOR HEAT | $4,694 | $9,522 | Not Implemented |
IC0241 # 03 Y:2020 | 03 | 2020 | PAY BILLS ON TIME TO AVOID LATE FEES | $5,410 | $0 | Implemented |
IC0241 # 04 Y:2020 | 04 | 2020 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $7,230 | $0 | Implemented |
IC0241 # 05 Y:2020 | 05 | 2020 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $4,157 | $12,984 | Implemented |
IC0241 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,521 | $4,105 | Implemented |
IC0241 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $520 | $210 | Not Implemented |
IC0241 # 08 Y:2020 | 08 | 2020 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $128,857 | $36,950 | Implemented |
IC0238 # 01 Y:2020 | 01 | 2020 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $31,874 | $24,382 | Not Implemented |
IC0238 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,907 | $5,000 | Not Implemented |
IC0238 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $781 | $1,758 | Not Implemented |
IC0238 # 04 Y:2020 | 04 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,791 | $83 | Not Implemented |
IC0238 # 05 Y:2020 | 05 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $979 | $240 | Not Implemented |
IC0237 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,797 | $2,350 | Not Implemented |
IC0237 # 02 Y:2020 | 02 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $32,993 | $2,764 | Not Implemented |
IC0237 # 03 Y:2020 | 03 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,125 | $0 | Not Implemented |
IC0237 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,251 | $2,864 | Not Implemented |
IC0237 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $1,275 | $177 | Not Implemented |
IC0237 # 06 Y:2020 | 06 | 2020 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $817 | $1,111 | Not Implemented |
IC0237 # 07 Y:2020 | 07 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $628 | $200 | Not Implemented |