IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK1027 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,403 $206,750 Not Implemented
OK1027 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,303 $6,900 Not Implemented
OK1027 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,207 $7,407 Not Implemented
OK1027 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,521 $4,542 Implemented
OK1027 # 05 Y:2020 05 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,801 $12,552 Not Implemented
OK1025 # 01 Y:2020 01 2020 USE RADIANT HEATER FOR SPOT HEATING $34,672 $127,500 Implemented
OK1025 # 02 Y:2020 02 2020 INSTALL TIMERS AND/OR THERMOSTATS $3,684 $2,420 Implemented
OK1025 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $5,805 $65 Implemented
OK1025 # 04 Y:2020 04 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,427 $1,500 Implemented
OK1025 # 05 Y:2020 05 2020 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $1,779 $2,207 Not Implemented
OK1025 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,733 $8,651 Implemented
OK1025 # 07 Y:2020 07 2020 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $548 $0 Not Implemented
OK1024 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,729 $0 Not Implemented
OK1024 # 02 Y:2020 02 2020 RECOVER WASTE HEAT FROM EQUIPMENT $6,084 $2,187 Not Implemented
OK1024 # 03 Y:2020 03 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,608 $4,500 Not Implemented
OK1024 # 04 Y:2020 04 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $515 $540 Not Implemented
OK1024 # 05 Y:2020 05 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,437 $3,178 Not Implemented
OK1024 # 06 Y:2020 06 2020 INSTALL TIMERS AND/OR THERMOSTATS $34,324 $2,448 Not Implemented
OK1023 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $770 $0 Not Implemented
OK1023 # 02 Y:2020 02 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,606 $4,736 Not Implemented
OK1023 # 03 Y:2020 03 2020 OPTIMIZE PLANT POWER FACTOR $464 $1,236 Not Implemented
OK1023 # 04 Y:2020 04 2020 USE RADIANT HEATER FOR SPOT HEATING $915 $3,252 Not Implemented
OK1023 # 05 Y:2020 05 2020 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $415 $538 Not Implemented
OK1023 # 06 Y:2020 06 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,874 $15,402 Not Implemented
OK1022 # 01 Y:2020 01 2020 OPTIMIZE PLANT POWER FACTOR $4,583 $2,665 Not Implemented